Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

2012-08-22

Wednesday, 8/22 - Continued Troubleshooting

HS3 Dryden Plan of the Day 2012-08-23

AV6 Functional Checkout (All Day)
AV1 Continued science prep
No PI access on A/C

HS3 Wallops Plan of the Day 2012-08-23

No PI teams required

2012-08-21

Tuesday, 8/21 - Successful PreCST!

HS3 Dryden Plan of the Day 2012-08-22

0730 morning tag up – optional for instrument teams

AV6 inside for troubleshooting
AV1 continued science prep
SHIS, AVAPS access to AV6 by request – supplying external power

HS3 Wallops Plan of the Day 2012-08-22

No PI teams required

2012-08-20

HS3 Dryden Plan of the Day 2012-08-21

0800 Instrument reps should be in the hangar to support testing

HS3 Wallops Plan of the Day 2012-08-21

1000 PI please be in hangar for possible PreCST
1300 All Hands Safety Brief (recorded for those arriving after this date)

2012-08-17

HS3 Dryden Plan of the Day 2012-08-17

No crew Saturday or Sunday

Monday, 8/20
0500 aircraft staging
0600 pre-CST

Each instrument team should have at least one member present for pre-CST at Dryden.
Arrive by 0530 latest.

HS3 Wallops Plan of the Day 2012-08-17

Monday, 8/20
0800 Staff PMOF
0900 pre-CST

Each instrument team should have at least one member present for pre-CST in the PMOF by 0800.

2012-08-16

HS3 Plan of the Day 2012-08-16

Friday 8/17/12
0600 End to end backbone test continues

Instrument team presence in the hangar is not required.

2012-08-15

HS3 Plan of the Day 2012-08-15

Thursday 8/16
0600 End to end backbone test begins

Instrument team presence in the hangar is not required.

2012-08-14

HS3 Plan of the Day 2012-08-14

Today was devoted to AV6 weight & balance.

Wednesday 8/15
0800 Power on and PI access to the aircraft
0800 AV6 instrument comm testing in the hangar

2012-08-13

HS3 Plan of the Day 2012-08-13

Today, all three AV6 instruments were mechanically installed.
Trucks were loaded with ground support equipment for transport to WFF.

Tuesday 8/14
Weight & Balance – no PI access to the aircraft.
Don Sullivan will be on site at DFRC for consultation.