Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit espo.nasa.gov for information about our current projects.

 

2013-08-07

Forecast Dry Run; August 6-16; See email sent to list serve on 7/30/13, titled 'HS3 Dry Run 2013'.

Please Note: Transits next week  are planned for takeoff at ~7 pm PDT; land ~0800 EDT. There is a possibility of a longer flight due to weather, science goals, or range conflicts. Please plan accordingly. See GHOC and GHOC-E Instrument Team Staffing notes below.

DFRC UPDATE: 

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Completed:

Instrument Post/Pre-flight and Aircraft Preflight

AV-1 Goals:

Pending: Nose camera lens installation and checkout

Thursday August 8:  Range Flight

PIs not required

Engine start 0600

Take off 0700

Landing 1200

Friday August 9: shipment prep


WFF UPDATE:

AV-1 Goals:

Thursday August 8:   Range Flight

PIs in GHOC-E 0830 EDT

Engine start 0900

Take off 1000

Landing 1500

 

Note: GHOC-E POR Staffing is optional after Takeoff + 2 hrs and prior to Landing – 2hrs, with the exception of any science or test activity (such as Drop Sonde launches, etc).

2013-08-06

DFRC UPDATE: 

AV-6 Goals:

Pending: Nose camera lens update

AV-1 Completed:

CST

AV-1 Goals:

Pending: Nose camera lens update

Wednesday August 7;  Instrument pre-flight and aircraft pre-flight

PI access 0800-1000 PDT

Thursday August 8;   Range Flight

PIs not required

Engine start 0600

Take off 0700

Landing 1200

Friday August 9: shipment prep

 

WFF UPDATE:

AV-1 Completed:

CST

AV-1 Goals:

Thursday August 8;   Range Flight

PIs in GHOC-E 0830 EDT

Engine start 0900

Take off 1000 

Landing 1500

2013-08-05

DFRC UPDATE: 

AV-6 Completed:

fueled

AV-1 Completed:

pre-CST

AV-1 Goals:

Pending: Nose camera lens update

Tuesday, August 6: CST; PI's optional, arrive 1100 in hangar. 1130 engine start

(delayed start due to airfield conflict)

Wednesday August 7: instrument pre-flight and aircraft pre-flight

Thursday August 8: range flight

Friday August 9: shipment (begin to think about this)

 

WFF UPDATE:

AV-1 Completed:

pre-CST

AV-1 Goals:

Tuesday August 6 - CST 1430

1400 PI's in GHOC-E

1430 CST

2013-08-02

DFRC UPDATE:  

AV-1 Completed:

HIWRAP software update

ADELE re-installed

2 trucks loaded

AV-1 Goals:

Pending: Nose camera lens update

Monday August 5 - pre-CST; PI's arrive 0800 in hangar. Comsec training ~1300

AV-6 Completed:

Friday August 2 - instrument post-flight; SHIS/AVAPS crates to DFRC shipping

 

WFF UPDATE:

AV-1 Goals:

Monday August 5 - pre-CST 1100

1000 PIs check in with ESPO 

1030 PI's in GHOC-E

1100 pre-CST

2013-08-01

DFRC UPDATE:  

AV-1 Completed:

Pending:   new camera lens for nose camera

AV-1 Goals:

Friday August 2 - Power on for HIWRAP, time approximately 1000

Monday August 5 - pre-CST; PI's arrive 0800 in hangar. Comsec training ~1300

AV-6 Completed:

Thursday August 1 - Range flight

AV-6 Goals:

Friday August 2 - instrument access 0800-1000; prepare crates for shipping 1000-1100

 

WFF UPDATE:

AV-1 Goals:

Monday August 5

1000 PIs check in with ESPO 

1030 PI's in GHOC-E

1100 pre-CST

AV-6 Completed:

Thursday August 1 - Range flight

2013-07-31

DFRC UPDATE:  

AV-1 Completed:

Pending:   new camera lens for nose camera

AV-6 Completed:

Wednesday July 31 - instrument pre-flight and aircraft pre-flight; AVAPS RF troubleshooting

AV-6 Goals:

Thursday August 1 - Range flight

0630 takeoff

1230 estimated landing

Friday August 2 - instrument access 0800

 

WFF UPDATE:

AV-6 Completed:

Wednesday July 31 – 0930 COMSEC Brief (for new arrivals)

AV-6 Goals:

0800 PIs at stations in GHOC-E

Thursday August 1 - Range flight

0830 Engine Start

0930 takeoff

1530 estimated landing

2013-07-30

DFRC UPDATE:  

AV-1 Completed:

Pending:   new camera lens for nose camera

AV-6 Completed:

Tuesday July 30  – CST, aircraft testing

AV-6 Goals:

Wednesday July 31 - instrument pre-flight and aircraft pre-flight; PI access 0800-1000

Thursday August 1 - Range flight

0630 takeoff

1230 estimated landing

Friday August 2 - instrument access


WFF UPDATE:

AV-6 Completed:

Tuesday July 30  – CST

AV-6 Goals:

Wednesday July 31 – 0930 COMSEC Brief (for new arrivals)

Thursday August 1 - Range flight

0800 PIs at stations in GHOC-E

0830 Engine Start

0930 takeoff

1530 estimated landing

2013-07-29

DFRC UPDATE:  

AV-1 Completed:

Pending:   new camera lens for nose camera

AV-6 Completed:

Monday July 29 - pre-CST

AV-6 Goals:

Tuesday July 30  – CST, engine start 0700, no PI's required

Wednesday July 31 - instrument pre-flight and aircraft pre-flight

Thursday August 1 - Range flight, 0630 takeoff

 

WFF UPDATE:

AV-6 Completed:

Monday July 29 - pre-CST

AV-6 Goals:

Tuesday July 30  – CST, engine start 1000, PI's in GHOC 0930 EDT

Thursday August 1 - Range flight, 0930 takeoff

 

2013-07-26

DFRC UPDATE:  

AV-1 Completed:

Pending:  new camera lens for nose camera

AV-6 Completed:

Friday July 26 - In-hangar IT/comm troubleshooting

AV-6 Planned:

Saturday - no PI activities

Sunday - no PI activities

Monday - pre-CST PI's arrive 0700 PDT

 

WFF UPDATE:

AV-6 Completed:

Friday July 26 - IT/Comm testing 

AV-6 Planned:

Saturday - no PI activities

Sunday - no PI activities

Monday - pre-CST PI's arrive 1000 EDT

2013-07-25

DFRC UPDATE:  

AV-1 Completed:

Thursday July 25 - removed EIPs 1/6 for firmware update

Pending:   new camera lens for nose camera, EIP firmware

AV-6 Completed:

Thursday July 25 - Outdoor Payload-IT testing and in-hangar troubleshooting

AV-6 Goals:

Friday July 26 – IT/Comm troubleshooting, 0600-1430 (no PI's needed)

Saturday - no PI activities

Sunday - no PI activities

Monday - pre-CST PI's arrive 0700 PDT

 

WFF UPDATE:

AV-6 Completed:

Thursday July 25 -  Outdoor Payload-IT testing 

AV-6 Goals:

Friday July 26  -  IT/Comm troubleshooting, 0900-1730 (no PI's needed)

Saturday - no PI activities

Sunday - no PI activities

Monday - pre-CST PI's arrive 1000 EDT