Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

HS3 Shipping

Integration/De-Integration Shipping to/from AFRC (Dryden)

[Instrument team name] - HS3 (Dave Fratello)
NASA Armstrong Flight Research Center
Warehouse #6 Bldg. 4876
Edwards AFB, CA 93524
ATTN: JERRY DOBBINS / (661) 510-6916, BLDG. 4840 - BAY 1

Shipping Direct to WFF

[Instrument team name] - HS3 (Ron Walsh, Code 840)
NASA Wallops Flight Facility
34200 Fulton St
Wallops Island, VA 23337
ATTN: RON WALSH / (757) 894-3682

Shipping Dates:

From AFRC to WFF: Ground Shipment for non-critical support equipment and haz mat* leaves 8/15, arrives WFF 8/22
From AFRC to WFF: Air Shipment(s) for critical pre-flight equipment leaves by noon on 8/19 (AV-1) and 8/21 (AV-6)**.

*List of Hazardous Materials needs to be submitted to steven.m.todorov@nasa.gov by 8/1. NO HAZ MATS on air shipments.
**Air shipments arrive in the WFF hangar two days after departing.

Return shipping dates are mission schedule dependent. The dates below are estimates.
From WFF to AFRC: Ground Shipment for non-critical support equipment and haz mat* leaves 9/24, arrives AFRC 10/1.
From WFF to AFRC: Air Shipment(s) for critical pre-flight equipement leave by noon on 9/30 and 10/2**.

*NO HAZ MATS on air shipments.
**Air shipments arrive in the WFF hangar two days after departing.

If you are planning on shipping direct to/from WFF, contact Ron Walsh at (757) 894-3682.

Please direct all shipping and logistics questions to Steven Todorov at (650) 996-9335 or steven.m.todorov@nasa.gov