HS3 07/18/14 Daily Schedule

AFRC Overview:

AV-1 Integration and aircraft activity continue

 

AFRC Accomplishments:

Avionics prepped for power

Power to instruments

Hangar IT testing

 

HAMSR and HIRAD successfully powered and transferred data. HIWRAP successfully powered and is troubleshooting an optical connection.

 

AFRC Outlook:

No activity planned for Saturday or Sunday

Monday 0830: AV-1 Outdoor Satcom/GHOC-E Data-IT testing of Instruments

Monday: AV-6 S-HIS and AVAPS Teams arrive, Integration activity

Wednesday: AV-6 CPL team arrives. Instruments fully integrated by COB

Thursday: AV-6 Hangar IT Testing

Friday: AV-6 W&B

 

WFF Monday Schedule:

0730 Badging, if needed

0800 Scan laptops

0900 COMSEC briefing

0930-1100 software downloads/installs if required

1100-1130 eat lunch

1130 Begin satcom testing in GHOC-E. Teams requested in this order: HAMSR, HIRAD, HIWRAP

 

AV-1 outdoor testing will start early (0630 Pacific) in the morning (to stay cool). Data IT performs tasks/checks before working with instrument teams. Ending time will vary with the temperature.

 

The HIWRAP team has made arrangements to be in the AFRC 4840 hangar over the weekend. Teams are reminded that U.S. citizens must be COMSEC-briefed before coming to the hangar unescorted. An Armstrong employee must be the escort to those U.S. citizens who have not yet had the briefing. Foreign nationals always need an Armstrong employee as escort in the hangar.

 

HS3 team members arriving Wallops and having difficulty with badging or entry, call ESPO 757-824-7000.

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.