Overview:
- AV-6 on schedule and fueled for Transit to WFF
- AV-1 on schedule, CST & Range Flt. next week
o AV-1 Inst. Teams: Note AFRC Schedule below
Today’s Accomplishments:
- GH GSE Truck Shipment #2 to WFF
Overview:
- AV-6 on schedule and fueled for Transit to WFF
- AV-1 on schedule, CST & Range Flt. next week
o AV-1 Inst. Teams: Note AFRC Schedule below
Today’s Accomplishments:
- GH GSE Truck Shipment #2 to WFF
Overview:
AV-1 & AV-6 on schedule
Successful AV-6 Range Flight
Today’s Accomplishments:
AV-6 flew a successful Range Flight, meeting all objectives
o 4 Sondes dropped in PIRA, have been recovered
o CPL LIDAR on for ~2.75 hrs
o CPL, S-HIS, or AVAPS Teams report no issues
o Instrument’s Post-flight after landing
GH GSE Truck Shipment #1 to WFF
HS3 Dry Run continued
Bruce Tagg visit to GHOC-E during flight
Overview:
AV-1 & AV-6 on schedule
AV-6 Range Flight Tomorrow (early) morning.
Today’s Accomplishments:
AV-6 CST Fueled and A/C and Instruments Preflighted
HS3 Range Priority established; T-1 complete
HS3 Dry Run continued
Plan for Tomorrow (Wednesday):
0500 PDT: T-0 Preflight Briefing
o Bldg. 4840, Rm 113A at AFRC
0530 PDT: Crew in GHOC (0830 PI’s in GHOC-E)
0545 PDT: Engine Start
0630 PDT: Takeoff for ~5-6 hr flight
Overview:
AV-1 & AV-6 on schedule
AV-6 Range Flight this Wed.
Today’s Accomplishments:
AV-6 CST Completed successfully (Camera Pics)
HS3 Dry Run started
Plan for Tomorrow (Tuesday):
0630: Fuel aircraft
0730 – 0930: Pre-flight Instruments
o A/C Power and Data-IT support
o All AV-6 Instr. P.I.’s in Hangar
0800 PDT (1100 EDT) Dry Run Continues
o 877-217-8791 (3581543#)
Overview:
AV-6 “CST” on Monday (see Schedule below)
Dry Run starts on Monday (see Schedule below)
Today’s Accomplishments:
AV-6 Preflight activity
No activity Saturday - Sunday
Outlook Next Week:
Monday (4Aug): AV-6 CST (all times PDT):
o 0745: Pre-Brief Mtg. (see email for conference number)
o 0830: Crew & P.I.’s staff GHOC
- (1130 EDT: GHOC-E Payload Team Staffing)
Overview:
AV-6 Ready for “CST” on Monday (see CST Schedule below)
AV-1 Ready for Science Team’s return on 11Aug
Today’s Accomplishments:
AV-6 Data-IT activity
o Ku testing with HS3’14 Ku Transmission Plan
HDVis Environmental Lab Test successful
HDVis lens refocus / camera reassembly
The Plan for Tomorrow (Friday):
0730: GH Leads Mtg in Payload Cage
GH Crew begins AV-6 CST Preflight activity
No AV-6 Science/P.I. Activity at AFRC/WFF
Overview:
AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF
AV-6 Ready for CST (pic)
Today’s Accomplishments:
AV-6 Data-IT activity
o S-HIS Pre-flight complete for CST
o All instruments are now ready for CST
AV-1 Data-IT activity (Link Mod) (pic)
HDVis setup in Environmental Lab
Visiting Teachers tour
The Plan for Thurs (all times PDT):
0600: HDVis Enviro Lab Testing
Overview:
AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF
AV-6 ahead of schedule
Today’s Accomplishments:
AV-6 Pre-CST passed
o S-HIS removed, and re-installed for Avionics maintenance
o CPL Pre-flight complete for CST
o AVAPS Pre-flight complete for CST
AV-1 Maintenance
HS3’14 Tech Brief – Flight Approval signed
New flat-lens extension of HDVis delivered
The Plan for Wed (all times PDT):
Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.