HS3 08/06/14 Daily Schedule

Overview:

AV-1 & AV-6 on schedule

Successful AV-6 Range Flight

 

Today’s Accomplishments:

AV-6 flew a successful Range Flight, meeting all objectives

o   4 Sondes dropped in PIRA, have been recovered

o   CPL LIDAR on for ~2.75 hrs

o   CPL, S-HIS, or AVAPS Teams report no issues

o   Instrument’s Post-flight after landing

GH GSE Truck Shipment #1 to WFF

HS3 Dry Run continued

Bruce Tagg visit to GHOC-E during flight

HS3 08/05/14 Daily Schedule

Overview:

AV-1 & AV-6 on schedule

AV-6 Range Flight Tomorrow (early) morning.

 Today’s Accomplishments:

AV-6 CST Fueled and A/C and Instruments Preflighted

   HS3 Range Priority established; T-1 complete

HS3 Dry Run continued

 Plan for Tomorrow (Wednesday):

0500 PDT: T-0 Preflight Briefing

      o   Bldg. 4840, Rm 113A at AFRC

0530 PDT: Crew in GHOC (0830 PI’s in GHOC-E)

0545 PDT: Engine Start

0630 PDT: Takeoff for ~5-6 hr flight

HS3 08/04/14 Daily Schedule

Overview:

AV-1 & AV-6 on schedule

AV-6 Range Flight this Wed.

Today’s Accomplishments:

AV-6 CST Completed successfully (Camera Pics)

HS3 Dry Run started

Plan for Tomorrow (Tuesday):

0630: Fuel aircraft

0730 – 0930: Pre-flight Instruments

        o   A/C Power and Data-IT support

        o   All AV-6 Instr. P.I.’s in Hangar

0800 PDT (1100 EDT) Dry Run Continues

        o   877-217-8791 (3581543#)

HS3 08/01/14 Daily Schedule

Overview:

AV-6 “CST” on Monday (see Schedule below)

Dry Run starts on Monday (see Schedule below)

Today’s Accomplishments:

AV-6 Preflight activity

No activity Saturday - Sunday

Outlook Next Week:

Monday (4Aug): AV-6 CST (all times PDT):

   o   0745: Pre-Brief Mtg. (see email for conference number)

   o   0830: Crew & P.I.’s staff GHOC

       -  (1130 EDT: GHOC-E Payload Team Staffing)

HS3 07/31/14 Daily Schedule

Overview:

AV-6 Ready for “CST” on Monday (see CST Schedule below)

AV-1 Ready for Science Team’s return on 11Aug

 Today’s Accomplishments:

AV-6 Data-IT activity

    o   Ku testing with HS3’14 Ku Transmission Plan

HDVis Environmental Lab Test successful

HDVis lens refocus / camera reassembly

The Plan for Tomorrow (Friday):

0730: GH Leads Mtg in Payload Cage

GH Crew begins AV-6 CST Preflight activity

No AV-6 Science/P.I. Activity at AFRC/WFF

HS3 07/30/14 Daily Schedule

Overview:

AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF

AV-6 Ready for CST (pic)

 

Today’s Accomplishments:

AV-6 Data-IT activity

    o   S-HIS Pre-flight complete for CST

    o   All instruments are now ready for CST

AV-1 Data-IT activity (Link Mod) (pic)

HDVis setup in Environmental Lab

Visiting Teachers tour

The Plan for Thurs (all times PDT):

0600: HDVis Enviro Lab Testing

HS3 07/29/14 Daily Schedule

Overview:

AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF

AV-6 ahead of schedule

 

Today’s Accomplishments:

AV-6 Pre-CST passed

o   S-HIS removed, and re-installed for Avionics maintenance

o   CPL Pre-flight complete for CST

o   AVAPS Pre-flight complete for CST

AV-1 Maintenance

HS3’14 Tech Brief – Flight Approval signed

New flat-lens extension of HDVis delivered

The Plan for Wed (all times PDT):

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.