Daily Schedule

ATom Plan of the Day

A/C access for Monday (7/18) will be approx. 1030 to 1500

We are planning a 0900 takeoff for the first t/s effort for the "hum" issue. Should only be an hour.

We will have details available following the flight and at 1300 on whether we will need a flight on Tuesday. If we do need to fly Tuesday we are planning two flights so access will be limited.

ATom Plan of the Day

A/C access for Saturday (7/16) will be for the CIT-CIMS servicing. No aircraft access. Mike Moore will assist the servicing at 0700.

Sunday (07/17) will be a NO A/C ACCESS and Dave Johnson will assist at 0700.

Reminder: we still have not been able to locate and eliminate the source of the “hum” found during the shake flight. As a result, we are planning a 1 hr  flight on Monday 7/18 to T/S our latest finding and attempt at a fix. PLEASE BE DILIGIENT IF YOU HAVE LEFT OR ARE LEAVING BEFORE NEXT WEEK TO KEEP YOUR INSTRUMENT AS WELL AS THE A/C IN FLYABLE CONDITION.

Flight is set for 0900. A/c access for those here will be available shortly after the flight is completed and aircraft is in hangar. Only available until normal crew day of 1500-1530.

A/C access for Friday (7/15) will be 07:00 to 15:00

  • From the 1300 meeting today, the current group of experimenters have expressed no need for A/C access on Saturday. Thank you for your communication. As a result,
  • Saturday (7/16) and Sunday (07/17) will be a NO A/C ACCESS DAY.  On Saturday Mike Moore will assist with the CIT–CIMS Cryo Service and on Sunday Dave Johnson will assist. If you could please coordinate the times accordingly if you haven’t that would be great.
  • As you all may have heard, we still have not been able to locate and eliminate the source of the “hum” found during the shake flight. As a result, we are planning a 1 hr  flight on Monday 7/18 to T/S our latest finding and attempt at a fix. PLEASE BE DILIGIENT IF YOU HAVE LEFT OR ARE LEAVING BEFORE NEXT WEEK TO KEEP YOUR INSTRUMENT AS WELL AS THE A/C IN FLYABLE CONDITION.

ATom Plan of the Day

A/C access for Thursday (7/14), Friday (7/15) and Saturday (7/16) will be 07:00 to 15:00.

Mr. Matt Berry will be taking over the Plan of the Day duties until the the 25th.

ATom Plan of the Day

Tuesday, 12 July
First Science Test Flight successful with some issues but Thursday’s Contingency Science Flight cancelled

Wednesday, 13 July
07:00-17:30 a/c access
Pilot proficiency night flight

Thursday, 14 July
07:00-15:00 a/c access

ATom Plan of the Day

Monday, 11 July
Shake down flight successful
TOGA inlet was humming during turns but it wasn’t deemed a show stopper

Tuesday, 12 July
Science Test Flight #1 (ETD 11:30)
06:40 HR-AMS instrument servicing (no one else on a/c during this)
07:00 a/c outside
07:00-11:00 a/c access
11:00 doors closed
Preflight briefing @ 10:00 (1st time flyers, as well as a representative from each instrument, must attend)

Landing estimated at 16:00
Post flight meeting in science lab 20-30 minutes after landing

ATom Plan of the Day

Sunday, 10 July

PANTHER/UCATS instrument work

Monday, 11 July
Shake down flight (ETD 10:00)
06:00-06:15 PALMS gas servicing (no one else on a/c)
06:15-06:30  PANTHER/UCATS install
~ 07:00  a/c taken outside
a/c access when outside
Preflight briefing - 08:30
a/c doors closed  - 09:30
a/c access ~ 12:30

Tuesday, 12 July
Science Test Flight #1 (ETD 11:30)
a/c access ~ 08:30
Preflight briefing - 10:00
a/c doors closed - 11:00

ATom Plan of the Day

Saturday, 9 July

CAPS installed
TOGA instrument work
QCLS instrument work
PANTHER/UCATS installation work
ATHOS instrument work
MMS completed leak check

Sunday, 10 July

No aircraft access
Lab open

Upcoming:

Monday, 11 July
Shake down flight (ETD 10:00)
06:-06:15 PALMS gas servicing (no one else on a/c)
06:15-06:30  PANTHER/UCATS install
~ 07:00  a/c taken outside
a/c access when outside
Preflight briefing - 08:30
a/c doors closed  - 09:30

Tuesday, 12 July
Science Test Flight #1 (ETD 11:30)
a/c access ~ 08:30
Preflight briefing - 10:00
a/c doors closed - 11:00

ATom Plan of the Day

Friday, 8 July

  • ISAF completed installation and power check complete
  • QCLS completed power check
  • TOGA completed power check
  • CAPS completed calibration
  • PANTHER/UCATS completed power check
  • MMS completed installation
  • AO2/Medusa performed leak checks

Saturday, 9 July

  • 07:00-15:00  Aircraft access
  • TOGA, ISAF and QCLS power checks

Upcoming:

  • 11 July: Shake down flight (ETD 10:00) (a/c access from 07:30 to 08:30 outside)
    • Preflight briefing 08:30
    • Doors closed 09:30
  • 12 July: Science Test Flight #1 (ETD 11:30)

ATom Plan of the Day

Thursday, 7 July

  • Media Day
  • ARMAS installed and power check complete
  • PANTER/UCATS installed and power check complete
  • MMS essentially completed installation and power check complete
  • TOGA completed installation
  • ISAF mechanically installed
  • Aircraft fuselage pressure check complete
  • Aircraft weight and balance complete

Friday, 8 July

  • 06:30-17:30  Aircraft access
  • TOGA, ISAF and QCLS power checks

Upcoming:

  • 11 July: Shake down flight (ETD 10:00) (a/c access from 07:30 to 08:30 outside)
    •         Preflight briefing 08:30
    •         Doors closed 09:30
  • 12 July: Science Test Flight #1 (ETD 11:30)