2014-09-16

Overview:  AV-6 Science Flight #7 is currently flying and is scheduled to land at 0700 EDT tomorrow.

 

Thursday is the next possible flight day.

 

All instrument teams should plan to be at D-1 by 0900 tomorrow for Postflight/Preflight for a possible Thursday flight.

 

 

Wed Sep 17 (Science Flight #7)

WFF (EDT)

-  0700 AV-6 Land

-  0800 Forecast Briefing (S115)

-  0900 Postflight/Preflight for a possible Thursday flight

-  1030 Science Flight #7 Debrief (S115)

-  1930 Forecast Briefing (S115)

 

 

Thu Sep 18

WFF (EDT)

-  0700 AV-6 Takeoff (possible)

-  0800 Forecast Briefing (S115)

-  0930 COMSEC brief (S115)

-  1930 Forecast Briefing (S115)

 


2014-09-15

Overview:  AV-6 Science Flight #6 returned after a successful flight over Edouard. Edouard was upgraded to a Cat 2 hurricane during the flight. AVAPS has worked some instrument issues today and is ready for tomorrow’s flight.

 

Tomorrow’s flight is planned for 24 hours with a nominal takeoff of 0800. There is a possibility of delayed takeoff due to weather. If that happens, it may be possible for a slight delay, or even an evening takeoff at 1800.

 

 Tue Sep 16 (Science Flight #7)

WFF (EDT)

-  0645 Staff GHOCE

-  0715 AV-6 Engine Start

-  0800 AV-6 Takeoff

-  0800 Forecast Briefing (S115)

-  0930 COMSEC brief (S115)

-  1930 Forecast Briefing (S115)

 

 Wed Sep 17

WFF (EDT)

-  0800 AV-6 Land

-  0800 Forecast Briefing (S115)

-  1100 Postflight/Preflight for possible Thu flight

-  1930 Forecast Briefing (S115)


 

2014-09-14

Overview:  AV-6 Science Flight #6 is currently flying and is scheduled to land at 0700 EDT tomorrow. During today's flight Edouard was upgraded to a Cat 1 hurricane. As I write this, sondes are dropping at high frequency into the eye of the storm.
 
Tuesday is the next possible flight day. Mission science is aiming for a 0700 takeoff but will make the final decision tomorrow morning based on the local forecast for Tuesday morning. A Tuesday evening takeoff at 1800 would be the backup plan.
 
All instrument teams should plan to be at D-1 by 0900 tomorrow for Postflight/Preflight for a Tuesday takeoff.
 
Mon Sep 15
WFF (EDT)
-  0700 AV-6 Land
-  0800 Forecast Briefing (S115)
-  0900 Postflight/Preflight for Tuesday's flight
-  1030 Science Flight #6 Debrief (S115)
-  1930 Forecast Briefing (S115)
 
Tue Sep 16 (Science Flight #7)
WFF (EDT)
-  0700 AV-6 Takeoff (nominal)
-  0800 Forecast Briefing (S115)
-  0930 COMSEC brief (S115)
-  1800 AV-6 Takeoff (backup)
-  1930 Forecast Briefing (S115)

2014-09-13

Overview:  AV-6 Science Flight #6 is scheduled to takeoff at 0700 tomorrow for a planned 24-hr flight to TS Edouard. TS Edouard is expected to gradually intensify to a Cat 1-2 hurricane in the next 72 hours. 80 sondes will be loaded for the flight.
 
Sun Sep 14 (Science Flight #6)
WFF (EDT)
-  0545 Staff GHOCE
-  0615 AV-6 Engine Start
-  0700 AV-6 Takeoff
-  0800 Forecast Briefing (S115)
-  1930 Forecast Briefing (S115)
 
Mon Sep 15
WFF (EDT)
-  0700 AV-6 Land
-  0800 Forecast Briefing (S115)
-  0900 Postflight/Preflight for possible Tue flight
-  1930 Forecast Briefing (S115)

2014-09-12

Overview:  AV-6 Science Flight #5 landed this evening at 1749 EDT. During the flight, TD06 was upgraded to TS Edouard by the NHC. 64 sondes were deployed over the course of the 25-hr flight.
 
Mission Science is currently looking at both Sat evening and Sun morning takeoff options depending on local weather. Update at 0800 Saturday.
 
Note: AV-6 Instrument Postflight was shifted back two hours to 0900 Saturday.
 
Sat Sep 13 (potential evening takeoff for Science Flight #6)
WFF (EDT)
   -  0800 Forecast Briefing (S115)
   -  0800 Computer Scans
   -  0900 AV-6 Instrument Postflight/Preflight
   -  1930 Forecast Briefing (S115)
If the flight is Sat evening:
-  1645 Staff GHOCE
-  1715 AV-6 Engine Start
-  1800 AV-6 Takeoff
 
Sun Sep 14 (potential morning takeoff for Science Flight #6)
WFF (EDT)
   -  0800 Forecast Briefing (S115)
   -  1930 Forecast Briefing (S115)
If the flight is Sun morning:
-  0545 Staff GHOCE
-  0615 AV-6 Engine Start
-  0700 AV-6 Takeoff

2014-09-11

Overview:  AV-6 Science Flight #5 is scheduled to takeoff this evening at 1800 EDT for a 25-hr flight into TD06 (formerly P29/I91L). This system was upgraded to a tropical depression around 1130 EDT. The issue with the Iridium links that postponed yesterday’s takeoff was the fault of the service provider and has been resolved. 65 sondes are loaded for this flight.
 
Fri Sep 12
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  1900 (estimated) AV-6 Land
-  1930 Forecast Briefing (S115)
 
Sat Sep 13
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  1100 AV-6 Instrument Postflight
-  TBD  Science Flight #5 Debrief (S115)
-  1930 Forecast Briefing (S115)

2014-09-10

Overview:  AV-6 Science Flight #5 is scheduled to takeoff today at 1800 EDT for a 25-hr flight into P29/91L. The disturbance is still unorganized, but it is expected by most models to consolidate and slowly intensify. The NHC gives a 20-70% chance of development into a TC in 2-5 days. 65 sondes are loaded for this flight.
 
Tentative schedule for next AV-6 flight would be takeoff Friday evening with P29/91L as the target again, although the local weather doesn’t look too promising.
 
Thur Sep 11 (Media Day)
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  0930 COMSEC Brief
-  1900 (estimated) AV-6 Land
-  1930 Forecast Briefing (S115)
 
Fri Sep 12 (possible Science Flight #6 - time TBD)
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  1100 AV-6 Instrument Postflight/Preflight for potential Fri evening flight
-  TBD  Science Flight #5 Debrief (S115)
-  1930 Forecast Briefing (S115)

2014-09-09

Overview:  AV-6 Science Flight #5 is scheduled to fly tomorrow at 1800 EDT (target P29/I91L; 65 sondes are being loaded). Media Day is scheduled for Thursday.
  
Wed Sep 10 (AV-6 Science Flight #5)
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  1645 Staff GHOCE
-  1715 AV-6 Engine Start
-  1800 AV-6 Takeoff
-  1930 Forecast Briefing (S115)
 
Thur Sep 11 (Media Day)
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  0930 COMSEC Brief
-  1900 (estimated) AV-6 Land
-  1930 Forecast Briefing (S115)

2014-09-08

Overview:  AV-6 engine nozzle change is complete and engine run was successful. Next potential flight Wed Sep 10 (target P29L).
 
The decision was made at this morning's weather brief to cancel Tuesday's flight due to inclement local weather. The next potential AV-6 flight will be Wednesday. The takeoff time for a potential Wednesday flight is TBD and will be determined NLT 1400 Tuesday afternoon.
   
Tue Sep 9
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  0830 Computer Scans
-  0930 COMSEC Briefing (S115)
-  1930 Forecast Briefing (S115)
 
Wed Sep 10 (possible Science Flight #5)
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  1930 Forecast Briefing (S115)

2014-09-07

Overview:  AV-6 engine nozzle change in progress.  Next potential flight Tue Sep 9 (target P29L).
 
Showers are forecast locally through Tuesday. A go/no-go decision will be made Monday afternoon for either a Tuesday morning or Tuesday evening flight. If AV-6 cannot takeoff due to weather on Tuesday, then the next potential AV-6 flight will be Wednesday morning.
 
Mon Sep 8
WFF (EDT)
-  0800 Forecast briefing (S115)
-  0830 Computer scans (S217)
-  1030 Science flight #4 debrief (S115)
-  TBD (after AV-6 engine run) Instrument preflight for potential Tue flight
-  1930 Forecast briefing (S115)
     
Tue Sep 9
WFF (EDT)
-  0800 Forecast Briefing (S115)
-  0930 COMSEC Briefing (S115)
-  1930 Forecast Briefing (S115)
  
If decision is made to fly Tue morning:
-  0615 Staff GHOCE
-  0645 AV-6 Engine Start
-  0730 AV-6 Takeoff
If decision is made to fly Tue evening:
-  1630 Staff GHOCE
-  1715 AV-6 Engine Start
-  1800 AV-6 Takeoff