AFRC Overview:
AV-1 Integration and aircraft activity continue
AFRC Accomplishments:
Avionics prepped for power
Power to instruments
Hangar IT testing
HAMSR and HIRAD successfully powered and transferred data. HIWRAP successfully powered and is troubleshooting an optical connection.
AFRC Outlook:
No activity planned for Saturday or Sunday
Monday 0830: AV-1 Outdoor Satcom/GHOC-E Data-IT testing of Instruments
Monday: AV-6 S-HIS and AVAPS Teams arrive, Integration activity
Wednesday: AV-6 CPL team arrives. Instruments fully integrated by COB
Thursday: AV-6 Hangar IT Testing
Friday: AV-6 W&B
WFF Monday Schedule:
0730 Badging, if needed
0800 Scan laptops
0900 COMSEC briefing
0930-1100 software downloads/installs if required
1100-1130 eat lunch
1130 Begin satcom testing in GHOC-E. Teams requested in this order: HAMSR, HIRAD, HIWRAP
AV-1 outdoor testing will start early (0630 Pacific) in the morning (to stay cool). Data IT performs tasks/checks before working with instrument teams. Ending time will vary with the temperature.
The HIWRAP team has made arrangements to be in the AFRC 4840 hangar over the weekend. Teams are reminded that U.S. citizens must be COMSEC-briefed before coming to the hangar unescorted. An Armstrong employee must be the escort to those U.S. citizens who have not yet had the briefing. Foreign nationals always need an Armstrong employee as escort in the hangar.
HS3 team members arriving Wallops and having difficulty with badging or entry, call ESPO 757-824-7000.