Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

Associated content: 

Hawkeye A/C Installation

Date: 
Monday, December 8, 2014 (All day) - Friday, December 12, 2014 (All day)

AIITS Environmental Testing (cont.)

Date: 
Monday, December 1, 2014 (All day) - Wednesday, December 3, 2014 (All day)

Hawkeye Personnel Arrive

Date: 
Sunday, November 30, 2014 (All day)

Thanksgiving Holiday

Date: 
Thursday, November 27, 2014 (All day) - Friday, November 28, 2014 (All day)

AIITS unpack, SIL Bench Tests

Date: 
Monday, November 17, 2014 (All day) - Thursday, November 20, 2014 (All day)

AIITS Personnel Arrive

Date: 
Sunday, November 16, 2014 (All day)

The Residual-Mean Circulation in the Tropical Tropopause Layer Driven by Tropical Waves

Ortland, D. A., and M. J. Alexander (2014), The Residual-Mean Circulation in the Tropical Tropopause Layer Driven by Tropical Waves, J. Atmos. Sci., 71, 1305-1322, doi:10.1175/JAS-D-13-0100.1.

A new wave scheme for trajectory simulations of stratospheric water vapor

Kim, J., and M. J. Alexander (2013), A new wave scheme for trajectory simulations of stratospheric water vapor, Geophys. Res. Lett., 40, 1-5, doi:10.1002/grl.50963.

Tropical Precipitation Variability and Convectively Coupled Equatorial Waves on Submonthly Time Scales in Reanalyses and TRMM

NASA Brings Science to Life in Guam Classrooms

In addition to doing cutting-edge atmospheric science, ATTREX team shared the excitement of their scientific mission with students, teachers in Guam.

Pages

Subscribe to RSS - ATTREX