ATTREX 02/26/14 Daily Schedule

Overview:

Science Flight #3 now scheduled for Friday

Pics of Activity (all four courtesy of Rafael Mendez)

Today’s Activities:

-Inmarsat and Ku Satcom are now operational.

- UCATS, SSFR, and Mini-DOAS performed Instrument Tests on the aircraft.

- Aircraft defueled (prep. for fuel valve replacement).

-Aircraft moved to USAF GH Hangar.

Plan for tomorrow, Wednesday

-GH Crew Down Day (with exception of 2 OA Tech’s to work req’d Task).

-No aircraft access by Instrument Teams.

-Replacement Quick Disconnect Fuel Valve arriving early evening.

Current Plan for Thursday is Preflight:

-Retrieve aircraft and perform Fuel Valve replacement.

-Fuel aircraft.

- Instrument Preflight activity – Estimated Schedule is:

o   ~1100 – 1400: Instrument Preflight with VTC Power and Data-IT

-Evening Pre-flight by DOAS, DLH, PCRS – Estimated Schedule is:

o   ~1800 – 2100: Instrument “Day-of-Flt” Preflight (no VTC Power or IT support)

Current Plan for Friday is Science Flt #3:

-Details will be posted Thursday, but draft schedule is:

o   T-0 Briefing @ 0030

o   PMOF Staffing @ 0110

o   Engine Start @ 0120

o   Takeoff @ 0205

o   Landing @ 1900 (17-hr flight)

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.