Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

Synonyms: 
KORUS-AQ (HL 5200)
Associated content: 

KORUS-AQ 04/21/16 Mission Daily Schedule

UPDATE FROM OSAN AB: (4/21/2016)

KORUS-AQ 04/20/16 Mission Daily Schedule

END OF THE DAY REPORT: Tuesday 4/19/2016

AFRC DC-8:
Work on instruments continues in preparation for the #2 instrument flight on Thursday.
Shipping coordination Continues.  If you have not spoken with Steven Todorov do so ASAP.

KORUS-AQ 04/19/16 Mission Daily Schedule

KORUS Plan for Tuesday 4/19 - AFRC DC-8
4/19: Tuesday
0700-1700  Aircraft and Lab Access
All flyers expecting to be on the Thursday Test Flight #2  contact Jack Dibb by 0900.  
Those who have not had egress training need to accounted for.

KORUS-AQ 04/18/16 Mission Daily Schedule

PLAN FOR 4/18:  Monday - 

KORUS-AQ 04/17/16 Mission Daily Schedule

PLAN FOR 4/17:  (escroll to the bottom for an update from Osan AB)
AFRC DC-8 KORUS Mission
4/17:  Sunday
0700-1200 Lab access only

DC-8 Loaded with KORUS Instruments

KORUS-AQ 04/16/16 Mission Daily Schedule

PLAN FOR 4/16
AFRC DC-8 KORUS Mission
4/16:  Saturday
0700-1700  Aircraft and Lab Access

4/17:  Sunday
0700-1200 Lab access only

KORUS-AQ 04/15/16 Mission Daily Schedule

PLAN FOR 4/15
Friday:  
0700-1200: DC-8 outside 
   Engine Run
   Pressurization check
   Wt / Balance - (Aircraft Inside Hangar) PI tool boxes in overhead to be included for Wt/Balance
1200-1400     Aircraft Pre-Flight
1400-1530     Engineering flight
1600-1700     Post-flight inspection
                        (Very Limited access)

DC-8 Palmdale laser calibrations

DC-8 In Palmdale

Pages

Subscribe to RSS - KORUS-AQ