KORUS-AQ 04/15/16 Mission Daily Schedule

PLAN FOR 4/15: 
Friday:  
0700-1200: DC-8 outside 
   Engine Run
   Pressurization check
   Wt / Balance - (Aircraft Inside Hangar) PI tool boxes in overhead to be included for Wt/Balance
1200-1400     Aircraft Pre-Flight
1400-1530     Engineering flight
1600-1700     Post-flight inspection
                        (Very Limited access)

NOTES:
TOOL CONTROL = All Tools are to be returned and signed off before flight
INSPECTION=All Instruments installed, secured and inspected before flight.
1000 & 1430  ROK Security Brief–AFRC/KORUS

4/16: Saturday
0700-1700    Aircraft Access

4/17: Sunday 
0700-1200    Lab access only

4/18: Monday’s science flight takeoff time is 1200.

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.