Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
28 |
29 |
30 |
31 |
|||
«
OIB Antarctic Deployment
2018-10-07 - 2018-11-21
»
|
||||||
«
CAT PHASE B MISSION
2018-07-09 - 2018-12-21
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Major Ops Inspection
2018-04-16 - 2019-02-15
»
|
||||||
«
806 CARE Preparation
2018-09-24 - 2018-11-08
»
|
||||||
«
B-200 Annual Maintenance
2018-10-01 - 2018-11-02
|
|
|||||
«
Maintenance - Unscheduled - R Lower Cowling Repair
2018-10-23 - 2018-10-29
|
L-band California / Colorado UAVSAR Science Flights
2018-10-30 - 2018-11-01
|
|
|
|||
«
HAARTS
2018-08-09 - 2019-01-02
»
|
||||||
«
UAS in the NAS
2018-10-22 - 2018-12-14
»
|
||||||
«
Installation of Nadir Portals
2018-06-20 - 2018-11-09
»
|
||||||
«
Aircraft Mod & Instrumentation
2018-07-02 - 2018-12-21
»
|
||||||
«
Nadir Window Modification
2018-09-04 - 2019-02-14
»
|
||||||
«
Maint/Mods
2018-10-15 - 2018-11-30
»
|
||||||
|
Autonomous Thermal Imager
2018-10-29 - 2018-11-30
»
|
|||||
LVIS 2018 Check Out Flights
2018-10-29 - 2018-12-14
»
|
||||||
ORACLES - Download
2018-10-29 - 2018-11-02
|
|
|||||
|
|
Wright-Patterson CCP
2018-11-01 - 2018-11-02
|
||||
|
||||||
«
OIB Antarctic Deployment
2018-10-07 - 2018-11-21
»
|
||||||
«
CAT PHASE B MISSION
2018-07-09 - 2018-12-21
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Major Ops Inspection
2018-04-16 - 2019-02-15
»
|
||||||
«
806 CARE Preparation
2018-09-24 - 2018-11-08
|
806 CARE Structural Modification (LM Site 2)
2018-11-09 - 2019-05-13
»
|
|||||
«
HAARTS
2018-08-09 - 2019-01-02
»
|
||||||
«
UAS in the NAS
2018-10-22 - 2018-12-14
»
|
||||||
«
Autonomous Thermal Imager
2018-10-29 - 2018-11-30
»
|
||||||
«
LVIS 2018 Check Out Flights
2018-10-29 - 2018-12-14
»
|
||||||
«
Installation of Nadir Portals
2018-06-20 - 2018-11-09
|
|
|||||
«
Aircraft Mod & Instrumentation
2018-07-02 - 2018-12-21
»
|
||||||
«
Nadir Window Modification
2018-09-04 - 2019-02-14
»
|
||||||
«
Maint/Mods
2018-10-15 - 2018-11-30
»
|
||||||
|
NTPS (Placeholder)
2018-11-05 - 2018-11-09
|
|
||||
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
Maintenance
2018-11-05 - 2018-12-05
»
|
||||||
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
L-band California / Colorado UAVSAR Science Flights
2018-11-05 - 2018-11-09
|
|
|||||
|
|
|
|
|||
«
OIB Antarctic Deployment
2018-10-07 - 2018-11-21
»
|
||||||
«
CAT PHASE B MISSION
2018-07-09 - 2018-12-21
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Major Ops Inspection
2018-04-16 - 2019-02-15
»
|
||||||
«
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
«
Maintenance
2018-11-05 - 2018-12-05
»
|
||||||
«
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
«
806 CARE Structural Modification (LM Site 2)
2018-11-09 - 2019-05-13
»
|
||||||
«
HAARTS
2018-08-09 - 2019-01-02
»
|
||||||
«
UAS in the NAS
2018-10-22 - 2018-12-14
»
|
||||||
«
Autonomous Thermal Imager
2018-10-29 - 2018-11-30
»
|
||||||
«
LVIS 2018 Check Out Flights
2018-10-29 - 2018-12-14
»
|
||||||
«
Aircraft Mod & Instrumentation
2018-07-02 - 2018-12-21
»
|
||||||
«
Nadir Window Modification
2018-09-04 - 2019-02-14
»
|
||||||
«
Maint/Mods
2018-10-15 - 2018-11-30
»
|
||||||
|
|
Major Ops Inspection
2018-11-13 - 2019-05-30
»
|
||||
Install Baseline Research System
2018-11-13 - 2019-02-01
»
|
||||||
Install In-House Baseline Structural Modifications
2018-11-13 - 2019-03-04
»
|
||||||
L-band California / Colorado UAVSAR Science Flights
2018-11-14 - 2018-11-15
|
|
|
||||
|
Long Beach Airshow Support
2018-11-15 - 2018-11-19
»
|
|||||
|
|
|||||
«
OIB Antarctic Deployment
2018-10-07 - 2018-11-21
|
|
OIB Antarctica Download
2018-11-23 - 2018-11-29
»
|
||||
«
CAT PHASE B MISSION
2018-07-09 - 2018-12-21
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Major Ops Inspection
2018-04-16 - 2019-02-15
»
|
||||||
«
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
«
Maintenance
2018-11-05 - 2018-12-05
»
|
||||||
«
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
«
806 CARE Structural Modification (LM Site 2)
2018-11-09 - 2019-05-13
»
|
||||||
«
Major Ops Inspection
2018-11-13 - 2019-05-30
»
|
||||||
«
HAARTS
2018-08-09 - 2019-01-02
»
|
||||||
«
UAS in the NAS
2018-10-22 - 2018-12-14
»
|
||||||
«
Autonomous Thermal Imager
2018-10-29 - 2018-11-30
»
|
||||||
«
LVIS 2018 Check Out Flights
2018-10-29 - 2018-12-14
»
|
||||||
«
Long Beach Airshow Support
2018-11-15 - 2018-11-19
|
|
|
|
|
|
|
«
Aircraft Mod & Instrumentation
2018-07-02 - 2018-12-21
»
|
||||||
«
Nadir Window Modification
2018-09-04 - 2019-02-14
»
|
||||||
«
Maint/Mods
2018-10-15 - 2018-11-30
»
|
||||||
«
Install Baseline Research System
2018-11-13 - 2019-02-01
»
|
||||||
«
Install In-House Baseline Structural Modifications
2018-11-13 - 2019-03-04
»
|
||||||
|
AirBOS4 Installation & Ground Testing
2018-11-19 - 2018-11-21
|
|
|
|
||
|
|
|
||||
1 |
||||||
«
CAT PHASE B MISSION
2018-07-09 - 2018-12-21
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Major Ops Inspection
2018-04-16 - 2019-02-15
»
|
||||||
«
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
«
Maintenance
2018-11-05 - 2018-12-05
»
|
||||||
«
Annual Maintenance
2018-11-05 - 2018-12-21
»
|
||||||
«
806 CARE Structural Modification (LM Site 2)
2018-11-09 - 2019-05-13
»
|
||||||
«
Major Ops Inspection
2018-11-13 - 2019-05-30
»
|
||||||
«
HAARTS
2018-08-09 - 2019-01-02
»
|
||||||
«
UAS in the NAS
2018-10-22 - 2018-12-14
»
|
||||||
«
Autonomous Thermal Imager
2018-10-29 - 2018-11-30
|
|
|||||
«
LVIS 2018 Check Out Flights
2018-10-29 - 2018-12-14
»
|
||||||
«
Aircraft Mod & Instrumentation
2018-07-02 - 2018-12-21
»
|
||||||
«
Nadir Window Modification
2018-09-04 - 2019-02-14
»
|
||||||
«
Maint/Mods
2018-10-15 - 2018-11-30
|
|
|||||
«
Install Baseline Research System
2018-11-13 - 2019-02-01
»
|
||||||
«
Install In-House Baseline Structural Modifications
2018-11-13 - 2019-03-04
»
|
||||||
«
OIB Antarctica Download
2018-11-23 - 2018-11-29
|
|
|
||||
|
L-band California / Colorado UAVSAR Science Flights
2018-11-26 - 2018-11-27
|
Cockpit Upgrade / Ops 1&2 Package / Repair
2018-11-28 - 2019-02-01
»
|
||||
AirBOS4 Installation & Ground Testing
2018-11-26 - 2018-11-27
|
|
|
||||
|