If you have signed up for a shuttle van ride from your hotel to AFRC on Monday please indicate on the sign-up sheet what time you would liked to be picked up at the hotel (and which hotel)
7/30, Saturday
08:00-15:00 A/C access
15:00-16:00 PALMS instrument gas servicing (no one else allowed on a/c)
The Aircraft wash has been completed. The crew decided to tow the aircraft in due to the fires over the mountain.
We will plan to tow in to position for the outside test Monday morning. Still working details, on the side, for location and to limit any possible delays.
7/24 no Aircraft access other than servicing the CIT-CIMS instrument as planned.
Saturday 7/23
A/C out on wash rack to continue the wash
Sunday 7/24
A/C planned to remain outside in prep for Monday housekeeping/science system test
Monday 7/25
A/C located at wash rack and will be towed in after test, if possible, but may have to wait for SOFIA.
Access start at 0700
Access end at 1700