Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

POSIDON 10/20/16 Mission Daily Schedule

Accomplishments:
Science Flight #5 underway
Balloon Launch #2 Completed

Thursday, October 20th  - No Fly Day
REVISED POD
0900-1000 Aircraft Engine Run and Checkout
If all goes well 1000-1600 Aircraft access 

If further repairs are needed access will be moved to Friday

1500 Science/Weather Brief - Tell Ru-Shan/Eric if you have a science presentation

Friday, October 21st - Possible Flight Day #6
0700-0800 Instrument Upload
0830 Mission Brief (Ru-Shan will represent Science.  Each instrument team can let Ru-Shan know their instrument fly status.)
1030 Estimated Take-off
1330 Possible Balloon launch
1600 Estimated Landing
1630 Post Flight Brief (Send rep or inform Ru-Shan instrument update so download is not delayed)
1630-1830 Instrument Download

Saturday, October 22nd - Down Day
Sunday, October 23rd - Access Day
Monday, October 24th - Possible Fly Day