HS3 08/12/13 Daily Schedule

Dry Run continues daily until 08/16 at 0800 PDT/1100 EDT

 

DFRC UPDATE (PDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Goals:

Monday Aug 12:

AV1 Instrument Access for preflight (1000-1300)

AV-1 Aircraft preflight

Tuesday Aug 13:  AV-1 Ferry

1800 Engine Start

1900 Take Off

Wednesday Aug 14:

AV6 Instrument Access for preflight (1000-1300)

Aircraft preflight

Thursday Aug 15:  AV-6 Ferry

1800 Engine Start

1900 Take Off

 

WFF UPDATE (EDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Goals:

Monday Aug 12: No instrument PI activities

Orientation and safety brief for new arrivals.

Tuesday Aug 13:  AV-1 Ferry

1100 Daily Dry Run and Weather Brief - for WFF Wednesday Landing Weather

On site PIs check in with ESPO (757-824-7000) between 1300-1600

2030  PIs take places in GHOC – E

2100 Engine Start

2200 Take Off

Wednesday Aug 14

PIs must have a rep in GHOC-E at least 2 hrs prior to landing

(track on MTS to be aware of an early landing if it occurs)

0800 Landing

TBD Instrument Access

Possible COMSEC brief

Thursday Aug 15: AV-6 Ferry

On site PIs check in with ESPO (757-824-7000) between 1300-1600

2030  PIs take places in GHOC – E

2100 Engine Start

2200 Take Off

Friday Aug 16:

0800 Landing

PIs must have a rep in GHOC-E at least 2 hrs prior to landing

(track on MTS to be aware of an early landing if it occurs)

TBD Instrument Access

Possible COMSEC brief

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.