HS3 08/14/13 Daily Schedule

Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT

On Saturday we commence regular Forecast briefings at 0830 and 2030 EDT

 

DFRC UPDATE (PDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

Thursday Aug 15:

AV-6 Ferry

1700 Engine Start

1800 Take Off

Shipping - Coordinate with Dave Jordan on details

Friday August 16: truck shipment departs

 

WFF UPDATE (EDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

Thursday Aug 15:

AV-6 Ferry

On site PIs check in with ESPO (757-824-7000) between 1300-1600

1930  PIs take places in GHOC – E

2000 Engine Start

2100 Take Off

Friday Aug 16:

AV-6 Ferry

0730 Landing

1000 Comsec training

Saturday Aug 17:

AV-6 Instrument Post-Flight (0800-1100)

AV-1 Goals:

Thursday Aug 15:

AV-1 PI Access/Post-flight (0800 - 1000)

Saturday Aug 17:

AV-1 KU testing (PI's not required)

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.