Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
PLAN OF THE DAY SATURDAY, AUGUST 13:
NASA WB-57 Flight Day (RF#7)
NCAR G-V Hard Down Day
New Announcements:
Tomorrow there is rain forecasted, please unplug cords from the power source and do not leave them on the ground.
Meetings:
0730: FLIGHT MISSION BRIEF
LOCATION: ACCLIP Ops Center and via WebEx: https://espo.webex.com/espo/j.php?MTID=m75cce888d864e8912e57aa1084b9f47c
Meeting number: 2559 958 3664
Password: @cclip2022
Join by phone (Access code: 2559 958 3664)
US/Canada: +1-650-479-3207 / +1-855-244-8681
Korea: +82-70-7488-5000
NASA WB-57 Schedule: Flight Day (RF#7)
0500 MX at the hangar
0600 Instrument Upload
0700 Instruments Hand Off
0730 Mission Brief Go/No-Go (see virtual meeting details above)
0730 Aircraft tow/fuel
0830 Aircrew Suit Up
0915 Aircrew/Cockpit Integration
0930 Engine Start
0950 Taxi
1000 Take Off
TBD Landing
TBD Flight De-brief (Ops Center)/Payload access
NCAR G-V Schedule: Hard Down Day