Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

Associated content: 
Sub-categories: 

HS3 08/23/12 Daily Schedule

Thursday, August 23, 2012

AV6 Aircraft system testing continued

HS3 Dryden Plan of the Day 2012-08-24

0800-1200 AV6 Aircraft Operational Testing
1200-1500 Preflight for CST on Saturday

HS3 Wallops Plan of the Day 2012-08-24

WWF: All times EDT

1100-1500 Communication checks
No PI teams required

1330 Make up Safety Brief in conference room

Saturday, 8/25

1000 Each instrument team should have at least one member in PMOF for CST

HS3 08/22/12 Daily Schedule

Wednesday, 8/22 - Continued Troubleshooting

HS3 Dryden Plan of the Day 2012-08-23

AV6 Functional Checkout (All Day)
AV1 Continued science prep
No PI access on A/C

HS3 Wallops Plan of the Day 2012-08-23

No PI teams required

HS3 08/21/12 Daily Schedule

Tuesday, 8/21 - Successful PreCST!

HS3 Dryden Plan of the Day 2012-08-22

0730 morning tag up – optional for instrument teams

AV6 inside for troubleshooting
AV1 continued science prep
SHIS, AVAPS access to AV6 by request – supplying external power

HS3 Wallops Plan of the Day 2012-08-22

No PI teams required

HS3 08/20/12 Daily Schedule

HS3 Dryden Plan of the Day 2012-08-21

0800 Instrument reps should be in the hangar to support testing

HS3 Wallops Plan of the Day 2012-08-21

1000 PI please be in hangar for possible PreCST
1300 All Hands Safety Brief (recorded for those arriving after this date)

PMOF Environment Layout

HS3 08/17/12 Daily Schedule

HS3 Dryden Plan of the Day 2012-08-17

No crew Saturday or Sunday

Monday, 8/20
0500 aircraft staging
0600 pre-CST

Each instrument team should have at least one member present for pre-CST at Dryden.
Arrive by 0530 latest.

HS3 Wallops Plan of the Day 2012-08-17

Monday, 8/20
0800 Staff PMOF
0900 pre-CST

Each instrument team should have at least one member present for pre-CST in the PMOF by 0800.

Wallops Office and Break Room

HS3 08/16/12 Daily Schedule

HS3 Plan of the Day 2012-08-16

Friday 8/17/12
0600 End to end backbone test continues

Instrument team presence in the hangar is not required.

Pages

Subscribe to RSS - HS3