ATTREX 02/05/14 Daily Schedule

ATTREX  GH Overview:

- Proceeding to a planned Science flight tomorrow, 0700 Takeoff.

- Pics from recent activities.

 

The Schedule for Thursday is:

- 0000 – 0300 ChST: Day-of-Flight Instr. Preflight by PCRS, Mini-DOAS, and DLH.

  o Instrument Team hands-off at 0300

- 0500: T-0 Briefing with GH Team & Science Leads (Building 18006, Rm 15)

- 0545: Staffing of PMOF and GHMOF by Instr. Teams and Flt Crew

- 0600: Engine Start

- 0700 (2100 Z, Wed): Take-off for a planned 14-hr flight

ATTREX 02/04/14 Daily Schedule

ATTREX  GH Overview:

- Instrument & Aircraft Pre-flight tomorrow for a planned Thursday flight, 0700 Takeoff.

 

The Schedule for tomorrow is:

- 0730 - 1030: Outdoor testing of Ku System

- 1000: T-1 Briefing with GH Team & Science Leads (Building 18006, Rm 15)

- 1100 – 1300: Instrument Preflight

  o Instrument Team hands-off at 1300

- 1300 – 1600: Aircraft Preflight

 

The Schedule for Thursday is:

ATTREX 02/04/14 Daily Schedule

Overview:

- Ku testing has confirmed the need for a Ku-HPA replacement, which will begin immediately.

- Next flight is now pushed to Thursday, 0700 takeoff.

 

Today’s activities:

- Performed Engine Wash, and outdoor OmniSTAR and Ku testing

- Reviewed DFRC/NGC data analysis of the Aborted T.O. with GH Chief Engineer

- KU HPA replacement to begin on aircraft

- MTP to be re-installed on aircraft on non-interference with Ku activity

 

The Plan for tomorrow (Wednesday) is:

ATTREX 02/03/14 Daily Schedule
Today's accomplishments:
- Down Day for GH Crew
- Consulting with L-3Com on Ku Fault
- Mission Planning activity
 
Tomorrow's Plan
- 0600: Aircraft moved back to Hangar 4
  o KU Waveguide maint.
- 0730: Aircraft outdoors for:
  o Engine Wash
  o Ku SatCom Testing
  o Additional OmniSTAR Characterization Testing
- 1000: Aircraft back to Hangar
Note: two possible paths after 1000:
&nb
ATTREX 02/02/14 Daily Schedule

Today’s activities:

- Post-flight completed with all instruments

- Performed Engine Wash, and outdoor OmniSTAR and Ku testing

- Reviewed NGC data analysis of the Aborted T.O. and downloaded HDVis images from the aircraft.

- GH moved to USAF GH Hangar until Tues morning.

 

The Plan for tomorrow (Monday):

- Hard Down Day for the GH Crew.

 

The Plan for Tuesday is:

- 0700: Aircraft retrieval from USAF GH Hangar

ATTREX 02/01/14 Daily Schedule

ATTREX  GH Overview:

- Instrument post-flight with external power, as needed.

- Reviewing data from today’s activity with NGC assistance

 

The Plan for tomorrow (Sunday) is:

- 0800 – 1000: Aircraft outside for OmniSTAR Testing

- 1030 – 1230: Instrument post-flight with aircraft power and Data-IT support

- ~1300: Aircraft towed to USAF GH Hangar through Tuesday 0600.

 

The Plan for Monday) is a Hard Down Day for the GH Crew

 

ATTREX 01/31/14 Daily Schedule
ATTREX  Instrument Pre-flight today at 1200 – 1330 (ChST):
    The aircraft gear maintenance activity is going well, and we have set the period noon-1330 for Instrument Pre-flight activity today.
    If your instrument needs any pre-flight activity today – please come to the Hangar by noon.
    Thanks.
 
We will announce the Day-of-Flight Schedule in a few hours…
ATTREX 01/29/14 Daily Schedule

ATTREX  GH Overview:

- Due to continued and forecast rain and low ceilings at AAFB, Guam,

and an issue with a computer in the GHMOF, the flight is cancelled for today and tomorrow.

 

The Schedule for today – aircraft is available for instrument activity as needed:

- The aircraft is available for instrument activity as needed through 1600.

- ATTREX Science Mtg at 1300 in Building 18006, Rm 15

- GH SSWG members in Guam to initiate review of GHMOF items

 

ATTREX 01/28/14 Daily Schedule

ATTREX  GH Overview:

- Due to continued rain and low ceilings at AAFB, Guam,

today’s flight schedule is postponed 24-hrs… see schedule below.

 

The Schedule for today – Aircraft stays in a “Preflight” condition:

- The GH Crew will drop Z-25 Fairing in prep for tomorrow’s Day-of-Flight Preflight activity

- No other aircraft support is expected.

- Science Note: Look for an announcement of an ATTREX Science Mtg (tomorrow if the flight is again postponed)

 

ATTREX 01/27/14 Daily Schedule

ATTREX  GH Overview:

- Instrument & Aircraft Pre-flight today.

- There is no ATTREX Science Team Mtg today.

- With the likelihood of continued rain and low ceilings at AAFB, Guam,

the flight tomorrow is postponed 6 hours… see schedule below.

 

The Schedule for tomorrow (Tuesday) is a Noon Takeoff:

- 0500 – 0800 ChST: Day-of-Flight Instr. Preflight by PCRS, Mini-DOAS, and DLH.

  o Instrument Team hands-off at 0800

- 1000: T-0 Briefing with GH Team & Science Leads (Building 18006, Rm 15)

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.