Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
23 |
24 |
25 |
26 |
27 |
28 |
|
«
Minor Ops Inspection
2013-11-20 - 2014-02-28
|
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
|||||
«
AirMOSS Mission CA, Calibration (FRs 14G015/14G016)
2014-02-10 - 2014-02-24
|
|
|
Deconfigure from AirMOSS
2014-02-27 - 2014-03-03
»
|
|||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
DC-8 at Heavy C Check Facility
2013-11-12 - 2014-03-01
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Phase 3 and 4 Inspection
2014-02-03 - 2014-02-28
|
|
|||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
UAS in the NAS Hardware Integration
2014-02-17 - 2014-02-28
|
|
|||||
«
ACES
2014-02-03 - 2014-03-14
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
ATTREX Deployment Guam
2014-01-21 - 2014-03-14
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
|
Operation Ice Bridge - Upload
2014-02-24 - 2014-02-26
|
|
||||
|
|
|||||
«
Deconfigure from AirMOSS
2014-02-27 - 2014-03-03
|
|
|
|
Direct Return Mission
2014-03-07 - 2014-03-11
»
|
||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
ACES
2014-02-03 - 2014-03-14
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
ATTREX Deployment Guam
2014-01-21 - 2014-03-14
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
|
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
|||||
UAS in the NAS Hardware Integration
2014-03-03 - 2014-03-07
|
|
|||||
WFF Closed Due to Snow
2014-03-03 - 2014-03-04
|
|
|
|
|
||
Local Flights
2014-03-03 - 2014-03-05
|
|
|
|
|||
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
|
|
|
||||
«
Direct Return Mission
2014-03-07 - 2014-03-11
|
|
|
|
GH 872 Team Returns to DFRC
2014-03-15 - 2014-03-17
»
|
||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
ACES
2014-02-03 - 2014-03-14
|
|
|||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
ATTREX Deployment Guam
2014-01-21 - 2014-03-14
|
|
|||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
|
Maintenance
2014-03-10 - 2014-04-16
»
|
|||||
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
|
|
Reconfigure for AirMOSS
2014-03-12 - 2014-03-16
»
|
||||
|
|
|
|
|||
«
GH 872 Team Returns to DFRC
2014-03-15 - 2014-03-17
|
AirMOSS Mission Calibration (FR 14G015)
2014-03-18 - 2014-03-23
»
|
|||||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
Maintenance
2014-03-10 - 2014-04-16
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
«
Reconfigure for AirMOSS
2014-03-12 - 2014-03-16
|
B Check
2014-03-17 - 2014-04-11
»
|
|||||
|
|
ATTREX Download
2014-03-18 - 2014-04-18
»
|
||||
|
UAS in the NAS Flight Testing
2014-03-20 - 2014-04-18
»
|
|||||
|
Airshow Flyover
2014-03-21 - 2014-03-22
|
|||||
|
|
|||||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
|
|
|||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
Maintenance
2014-03-10 - 2014-04-16
»
|
||||||
«
B Check
2014-03-17 - 2014-04-11
»
|
||||||
Ship 2 Modifications
2014-03-23 - 2014-07-31
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
UAS in the NAS Flight Testing
2014-03-20 - 2014-04-18
»
|
||||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
«
AirMOSS Mission Calibration (FR 14G015)
2014-03-18 - 2014-03-23
|
AirMOSS Mission CR (FR 14G016)
2014-03-24 - 2014-04-02
»
|
|||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
«
ATTREX Download
2014-03-18 - 2014-04-18
»
|
||||||
|
Two-Micron IPDA Lidar Flight Test
2014-03-24 - 2014-04-18
»
|
|||||
NAIMS
2014-03-24 - 2014-03-28
|
|
|||||
|
H-2 Payload I&T
2014-03-26 - 2014-04-13
»
|
|||||
|
|
|
|
|||
1 |
2 |
3 |
4 |
5 |
||
«
AirMOSS Mission CR (FR 14G016)
2014-03-24 - 2014-04-02
|
992 Maintenance
2014-04-03 - 2014-04-11
»
|
|||||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
|
|
|
||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
|
Flight Testing
2014-04-01 - 2014-05-15
»
|
|||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
Maintenance
2014-03-10 - 2014-04-16
»
|
||||||
«
B Check
2014-03-17 - 2014-04-11
»
|
||||||
«
Ship 2 Modifications
2014-03-23 - 2014-07-31
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
UAS in the NAS Flight Testing
2014-03-20 - 2014-04-18
»
|
||||||
«
Two-Micron IPDA Lidar Flight Test
2014-03-24 - 2014-04-18
»
|
||||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
«
H-2 Payload I&T
2014-03-26 - 2014-04-13
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
«
ATTREX Download
2014-03-18 - 2014-04-18
»
|
||||||
|
HyspIRI
2014-03-31 - 2014-05-09
»
|
|||||
|
|