Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
26 |
27 |
28 |
29 |
30 |
31 |
|
«
AirSWOT Cal/Val Flights
2013-03-08 - 2013-05-30
|
Maintenance
2013-05-31 - 2013-07-12
»
|
|||||
«
Payload I&T
2013-05-20 - 2013-06-17
»
|
||||||
«
NAMIS Updates, General Aircraft Maint., House Keeping Rack Upgrades
2013-04-15 - 2013-05-31
|
|
|||||
«
Avionics Upgrades
2013-05-06 - 2013-06-24
»
|
||||||
«
DB-110 Pod Demo
2013-03-15 - 2013-08-23
»
|
||||||
«
External Vision Systems
2013-04-15 - 2013-05-31
|
|
|||||
«
Visual Enhancement for General Aviation
2013-04-15 - 2013-05-31
|
|
|||||
«
California Fault Lines / Colorado Landslides
2013-04-22 - 2013-05-30
|
|
|
||||
«
AirSWOT FLight
2013-05-03 - 2013-06-03
»
|
||||||
«
Unmanned Aircraft Systems Integration in the National Airspace System
2013-05-13 - 2013-06-14
»
|
||||||
«
AVIRIS/Master HyspIRI
2013-05-20 - 2013-06-14
»
|
||||||
«
Deployment
2013-01-31 - 2013-11-24
»
|
||||||
«
NPP (eMAS, NAST-I, NAST-M/K, S-HIS)
2013-05-06 - 2013-05-31
|
|
|||||
«
Hawkeye Upload
2013-04-29 - 2013-06-25
»
|
||||||
|
MIZOPEX Upload
2013-05-27 - 2013-06-07
»
|
|||||
|
AirMOSS Mission ME/MA/NC (FR 13G018)
2013-05-28 - 2013-06-07
»
|
|||||
|
|
|
|
|
||
«
AirSWOT FLight
2013-05-03 - 2013-06-03
|
|
|
MIZOPEX Payload Engr check flight
2013-06-06 - 2013-06-07
|
|
||
|
|
|
|
UAVSAR/LVIS
2013-06-06 - 2013-06-19
»
|
||
«
Payload I&T
2013-05-20 - 2013-06-17
»
|
||||||
«
Avionics Upgrades
2013-05-06 - 2013-06-24
»
|
||||||
«
Maintenance
2013-05-31 - 2013-07-12
»
|
||||||
«
DB-110 Pod Demo
2013-03-15 - 2013-08-23
»
|
||||||
«
Unmanned Aircraft Systems Integration in the National Airspace System
2013-05-13 - 2013-06-14
»
|
||||||
«
AVIRIS/Master HyspIRI
2013-05-20 - 2013-06-14
»
|
||||||
«
Deployment
2013-01-31 - 2013-11-24
»
|
||||||
«
AirMOSS Mission ME/MA/NC (FR 13G018)
2013-05-28 - 2013-06-07
|
|
|||||
CARVE Phase 3 - Deployment
2013-06-02 - 2013-06-16
»
|
||||||
«
Hawkeye Upload
2013-04-29 - 2013-06-25
»
|
||||||
«
MIZOPEX Upload
2013-05-27 - 2013-06-07
|
|
|||||
|
MAMI
2013-06-03 - 2013-06-28
»
|
|||||
Limited Deployment-Cooperative Airspace Program
2013-06-03 - 2013-06-28
»
|
||||||
DAWN 2013
2013-06-03 - 2013-06-28
»
|
||||||
NAIMS
2013-06-03 - 2013-06-07
|
|
|||||
SEAC4RS Probes & Radiometers Upload FR138301
2013-06-03 - 2013-06-14
»
|
||||||
|
|
MABEL Upload
2013-06-07 - 2013-06-20
»
|
||||
|
|
|||||
«
Payload I&T
2013-05-20 - 2013-06-17
»
|
||||||
«
MAMI
2013-06-03 - 2013-06-28
»
|
||||||
«
Avionics Upgrades
2013-05-06 - 2013-06-24
»
|
||||||
«
Maintenance
2013-05-31 - 2013-07-12
»
|
||||||
«
DB-110 Pod Demo
2013-03-15 - 2013-08-23
»
|
||||||
«
Unmanned Aircraft Systems Integration in the National Airspace System
2013-05-13 - 2013-06-14
|
|
|||||
«
AVIRIS/Master HyspIRI
2013-05-20 - 2013-06-14
|
|
|||||
«
Limited Deployment-Cooperative Airspace Program
2013-06-03 - 2013-06-28
»
|
||||||
«
DAWN 2013
2013-06-03 - 2013-06-28
»
|
||||||
LAC Dedicated Flights
2013-06-09 - 2013-06-15
|
||||||
«
Deployment
2013-01-31 - 2013-11-24
»
|
||||||
«
CARVE Phase 3 - Deployment
2013-06-02 - 2013-06-16
»
|
||||||
«
Hawkeye Upload
2013-04-29 - 2013-06-25
»
|
||||||
«
SEAC4RS Probes & Radiometers Upload FR138301
2013-06-03 - 2013-06-14
|
|
|||||
«
UAVSAR/LVIS
2013-06-06 - 2013-06-19
»
|
||||||
«
MABEL Upload
2013-06-07 - 2013-06-20
»
|
||||||
|
GHOC East Checkout
2013-06-10 - 2013-06-28
»
|
|||||
AirMOSS Mission CH/OK (FR 13G018)
2013-06-10 - 2013-06-21
»
|
||||||
SARP Instrument Upload FR TBD
2013-06-10 - 2013-06-14
|
|
|||||
|
|
|
||||
«
Payload I&T
2013-05-20 - 2013-06-17
|
|
|
|
UAVSAR Upload
2013-06-21 - 2013-06-26
»
|
||
«
MAMI
2013-06-03 - 2013-06-28
»
|
||||||
«
Avionics Upgrades
2013-05-06 - 2013-06-24
»
|
||||||
«
Maintenance
2013-05-31 - 2013-07-12
»
|
||||||
«
DB-110 Pod Demo
2013-03-15 - 2013-08-23
»
|
||||||
«
Limited Deployment-Cooperative Airspace Program
2013-06-03 - 2013-06-28
»
|
||||||
«
DAWN 2013
2013-06-03 - 2013-06-28
»
|
||||||
«
GHOC East Checkout
2013-06-10 - 2013-06-28
»
|
||||||
«
AirMOSS Mission CH/OK (FR 13G018)
2013-06-10 - 2013-06-21
|
|
|||||
«
Deployment
2013-01-31 - 2013-11-24
»
|
||||||
«
CARVE Phase 3 - Deployment
2013-06-02 - 2013-06-16
|
Piggyback NASA ARMAS SBIR Phase 2 FR138007
2013-06-17 - 2013-06-19
|
|
K-Tech Telemetry System Upload
2013-06-21 - 2013-06-25
»
|
|||
«
Hawkeye Upload
2013-04-29 - 2013-06-25
»
|
||||||
«
UAVSAR/LVIS
2013-06-06 - 2013-06-19
|
|
|
|
|||
«
MABEL Upload
2013-06-07 - 2013-06-20
|
|
|
||||
|
RMOTC Mission
2013-06-17 - 2013-07-01
»
|
|||||
SARP FR TBD
2013-06-17 - 2013-06-19
|
|
|||||
SEAC4RS Probes
2013-06-17 - 2013-06-19
|
||||||
Photo Mission Upload
2013-06-17 - 2013-06-18
|
||||||
|
||||||
«
MAMI
2013-06-03 - 2013-06-28
|
|
|||||
«
RMOTC Mission
2013-06-17 - 2013-07-01
»
|
||||||
«
Avionics Upgrades
2013-05-06 - 2013-06-24
|
P-3 Maintenance Checks
2013-06-25 - 2013-07-03
»
|
|||||
«
Maintenance
2013-05-31 - 2013-07-12
»
|
||||||
«
DB-110 Pod Demo
2013-03-15 - 2013-08-23
»
|
||||||
«
Limited Deployment-Cooperative Airspace Program
2013-06-03 - 2013-06-28
|
|
|||||
«
DAWN 2013
2013-06-03 - 2013-06-28
|
|
|||||
«
GHOC East Checkout
2013-06-10 - 2013-06-28
|
|
|||||
«
Deployment
2013-01-31 - 2013-11-24
»
|
||||||
«
Hawkeye Upload
2013-04-29 - 2013-06-25
|
|
MABEL Check Flights
2013-06-27 - 2013-07-17
»
|
||||
«
UAVSAR Upload
2013-06-21 - 2013-06-26
|
|
AirMOSS Mission CA (Engineering/Calibration) (FR 13G017)
2013-06-28 - 2013-07-01
»
|
||||
«
K-Tech Telemetry System Upload
2013-06-21 - 2013-06-25
|
|
|
|
|
||
|
Daytime Dynamo Launch Window - B-200 Photo Mission
2013-06-24 - 2013-07-08
»
|
|||||
Unmanned Aircraft Systems Integration in the National Airspace System
2013-06-24 - 2013-06-28
|
|
|||||
|
|
|||||
1 |
2 |
3 |
4 |
5 |
6 |
|
|
|
MIZOPEX Science Deployment
2013-07-05 - 2013-08-16
»
|
||||
«
P-3 Maintenance Checks
2013-06-25 - 2013-07-03
|
|
|
AirMOSS Mission ME/MA/NC (FR 13G018)
2013-07-06 - 2013-07-14
»
|
|||
|
"A" INSPECTION
2013-07-01 - 2013-07-12
»
|
|||||
«
RMOTC Mission
2013-06-17 - 2013-07-01
|
CARVE Phase 4 - Deployment
2013-07-02 - 2013-07-16
»
|
|||||
«
Maintenance
2013-05-31 - 2013-07-12
»
|
||||||
«
DB-110 Pod Demo
2013-03-15 - 2013-08-23
»
|
||||||
«
Daytime Dynamo Launch Window - B-200 Photo Mission
2013-06-24 - 2013-07-08
»
|
||||||
«
MABEL Check Flights
2013-06-27 - 2013-07-17
»
|
||||||
«
Deployment
2013-01-31 - 2013-11-24
»
|
||||||
«
AirMOSS Mission CA (Engineering/Calibration) (FR 13G017)
2013-06-28 - 2013-07-01
|
|
|
|
|
|
|
|
|
Page Last Updated: April 22, 2017
Page Editor: Brad Bulger
NASA Official: Marilyn Vasques
Website Issues: Contact Us