HS3 08/14/14 Daily Schedule

Overview:

-          AV-1 Successful Range Flight (see below)

-          AV-6 Transit Flt. prep. continues

Today’s Accomplishments:

-          AV-1 completed a successful Range flight but did have a

Link mod failure just before descent and also had issues

with the radar altimeter during landing  (troubleshooting in

progress).  Both Low-light and Daylight Cameras worked and

Instrument data downloads completed

-          AV-6 Nose Gear swing test was complete and remaining

tests should be completed tomorrow.

-          HS3 Dry Run continued

Plan for Friday – AV-1 Range Flight (Times shown are local)

-          AFRC (PDT):

o   Continued troubleshooting on AV-1

o   Landing gear tests continued on AV-6

o   0800: HS3 HQ MRR

o   0800: Dry Run continues

o   Instrument Access

-          WFF (EDT):

o   1100: HS3 HQ MRR

o   1100: Dry Run continues

Outlook:  Keep in touch for update tomorrow!

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.