Overview:
- AV-1 preflighted for Range Flt.
- AV-6 Transit Flt. prep. continues
Today’s Accomplishments:
- AV-1 Instrument Preflight
o Low-light Camera installed/tested
- AV-6 Nose Gear replaced
o Awaiting Gear-swing test
- HS3 Dry Run continues
Plan for Thursday – AV-1 Range Flight (Times shown are local)
- AFRC (PDT):
o 0500: T-0 Briefing for Range Flight
o 0530: Crew in GHOC
o 0545: Engine Start
o ~0630: Take off for est. 5-6 hr flight
o 0800: Dry Run continues
- WFF (EDT):
o 0830: AV-1 P.I.’s in GHOC-E
o ~0930: Takeoff
o 1100: Dry Run continues
Outlook:
- Fri: HS3 MRR (WebEx and Phone)
- 19-20 Aug: AV-1 Transit to WFF (Aft. T.O., overnight flight)
o 18 Aug 0800-1000: Preflight of Inst’s
- 21-22 Aug: AV-6 Transit to WFF (Aft. T.O., overnight flight)
o 20 Aug 0800-1000: Preflight of Inst’s