Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

S-MODE 04/12/23 Mission Daily Schedule

Here is the Plan of the Day for Wednesday, April 12:

Updates:

  • Great day for S-MODE!
  • Sally Ride entered the ops area today and she surveyed an exceptional chlorophyll plume.
  • With the weather cooperating, all three aircraft flew with all instruments working nominally. 

 Aircraft schedule:

  • 0730: G-III PRISM preflight begins (go/no-go at 0800)
  • NET 1030: G-III SF#2 takeoff (weather dependent)
  • 1030: Preflight meeting for B200 SF#6
  • NET 1100: MASS TO SF#2 takeoff (weather dependent)
  • NET 1200: B200 SF#6 takeoff (weather dependent)

 Ship and in situ plan:

  • The Sally Ride continues surveying the plume region.
  • The seven deployed wave gliders will continue congregating in the plume region. An eighth wave glider is scheduled to be deployed Thursday from Santa Cruz.
  • Two Seagliders to continue operating lines in the southern portion of the ops area. Two Seagliders are moving to the strong SSH gradient region near 37N 125 20W.

Meeting schedule: