Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

ATTREX 02/20/15 Mission Daily Schedule

Overview:

  • Instruments and aircraft ready for CST on Monday, Flight on Tuesday
  • Note to all Inst. PI’s – please see GHOC show schedule below

Accomplishments:

  • AFRC “Tech Brief” held – CAST/ATTREX Science Flight Request approved and signed
  • MMS Nav-data cable repaired – tests confirm good data
  • GHOST and AIITS testing
  • Maintenance and avionics pre-flight activity
  • HDVis camera upgraded with new heater film – installed on aircraft
  • AFRC Ku Ground Station reinstalled and will be used during Range Flt.

Issues/Watch items:

  • Previous issues cleared

Upcoming Schedule:
Saturday/Sunday

  • No known activity planned in Payload Cage – no aircraft access

Monday: CST Schedule

  • 0615: GHOST LN2 Fill in the Hangar
  • 0730: T-0 Briefing in Payload Cage
  • 0800: All Instr. P.I.’s required in GHOC
  • CST: ~0815 to ~1100
  • 1300: T-1 Briefing for Range Flt (B4840, Rm 113B)

Tuesday: Range Flight

  • 0400: GHOST LN2 Fill in the Hangar
  • 0500: T-0 Briefing (B4840, Rm 113B)
  • 0550: All Instr. P.I.’s required in GHOC
  • 0600: Engine Start
  • 0700: Take-off