ATTREX 02/18/15 Mission Daily Schedule

Overview:
  • Pre-CST related activity performed – ready for CST Friday.
  • Air vehicle readiness and instrument integration/testing is on schedule.
Accomplishments:
  • Outdoor Satcom testing, including Pre-CST related testing
  • GHOST Cryostat LN2 fill performed on aircraft outdoors
  • Rehearsal for pre-Engine Start LN2 fill on flight days
  • GHOST TAM alignment measurements performed
  • AIITS troubleshooting software updates
Issues/Watch items:
  • MMS reports some noise on LN-100 nav data line; troubleshoot tomorrow
  • Wallops Ku Ground Station pointing issue unresolved; support from WFF requested
Upcoming Schedule:

Thursday: Maint and Avionics aircraft final prep for CST
Friday: All personnel participate in CST; Schedule TBA
Saturday: Support in Payload Cage for PIs as needed, no aircraft access

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.