ATTREX 02/03/14 Daily Schedule

Today's accomplishments:
- Down Day for GH Crew
- Consulting with L-3Com on Ku Fault
- Mission Planning activity
 
Tomorrow's Plan
- 0600: Aircraft moved back to Hangar 4
  o KU Waveguide maint.
- 0730: Aircraft outdoors for:
  o Engine Wash
  o Ku SatCom Testing
  o Additional OmniSTAR Characterization Testing
- 1000: Aircraft back to Hangar
Note: two possible paths after 1000:
  o If Ku testing is unsuccessful, the KU HPA will need to be replaced, which will take several hours and require outdoor testing. L3-Com has advised us this is a likely scenario. In this case, the proposed Wed Flt will need to move to Thursday, and Inst. Preflight activity will move to Wed.
  o If Ku testing is successful we will begin Instr. Preflight activity at 1030 for a proposed Wed. flt.
 
Standby for an update at 1000 hrs on this and the other two issues being worked:
- Reviewing NGC's  analysis and the GH Team's assessment of the Takeoff abort with DFRC Management.
- Status on the installation and config of the GHMOF backup Services Computer that has arrived at AAFB from DFRC.

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.