ATTREX

ATTREX 02/22/13 Daily Schedule

2/22 Accomplishments:
A/C landed at 07:24 after a 24.6 hour flight
NOAA O3 and water vapor removed (O3 has a computer problem)
NOAA UCATS removed
mini-DOAS removed (to work a problem with the IR telescope)

2/23 Plans:
Work on instrument problems
Field trip of 99 students from the Palmdale Aerospace Academy Middle School

ATTREX 02/21/13 Daily Schedule

2/21 Accomplishments:
A/C took off 13 minutes early for ATTREX science flight #4
A/C currently on the return leg of the science flight that took it to 12S latitude

2/22 Plans:
Recover A/C
Weigh and fuel the A/C
Prepare for Saturday field trip of 99 students from the Palmdale Aerospace Academy Middle School

Science Flight #5 is planned for Monday with an ETD of 20:00 PST

ATTREX 02/08/13 Daily Schedule

2/8 Accomplishments:
GWAS reinstalled and preflighted
NOAA UCATS reinstalled and preflighted
NOAA O3 lamp changed (I miss-stated yesterday that the lamp change was in UCATS) and it and Water Vapor are reinstalled and preflighted.
All other instruments preflighted
Aircraft preflighted

2/9 Plans:
06:30 take-off for second science flight

Instrument teams need to have a representative in the GHOC @ 05:15!!
ATTREX 02/07/13 Daily Schedule

2/7 Accomplishments:
GWAS determined their pump problem was a frozen bearing.  They think it was because the pump got too hot so they're going to use thermistors to monitor the pump's temperature.
While addressing a noisy pressure sensor NOAA UCATS got indications of a failing mercury lamp.  Pressure sensor was changed, lamp is on the way to be changed tomorrow afternoon
Got approval from all of those required to attempt a Saturday/Sunday science flight.

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.