clear-sky survey oriented mostly east-west from buoy N. BRDF bowtie underneath a G3 raster at eastern end. Center line at 12 kft to coincide with a dense smoke layer. Some slight cloud sampling north of Greenland on return. Porpoising between 300-1000ft near southern end of Nares before RTB.
ARCSIX
only P3 flight to ‘platypus’ region of the summer campaign. 2 cloud walls, first coordinated with Lear. 2-3 coordination points w G3. 2-hour segment at 300 ft to improve characterization of INP measurements at warmer temperatures. Low-level sampling within Kane basin on RTB.
Lincoln Sea, coastal survey. Cloud sampling (remote+in-situ) & aerosol. 4 coordination points w the G3
cloud sampling in cold sector of a cyclone w center at 60W, 87N. Cyclone has been in the Arctic for a while. 2 cloud walls. 3 coordination with G3, Lear on west wall.
clear-sky buoy survey and IceSat under flight and clear-sky BRDF characterization between buoy N to buoy O
Villum overlight, spiral descent offshore, low-level flying across sea ice and open water gradient, BRDF ‘bowtie’, higher-level Greenland coastal survey
Surface characterization across the open water crack to northeast of Greenland, spiral descent to west ending with clear-sky surface BRDF characterization further west off of northern crown of Greenland. Fog forecast at Pituffik cut BRDF run slightly short.
Clear-sky surface BRDF characterization north of Ellesmere.
During flight, the BRDF helix was moved towards the east to better align with clear skies. This was followed by a nearby truncated cloud wall, ~6kft leg with some cloud sampling to Nares, 35-minute low-level leg down Nares to northern end
POD August 16, 2024 - Transit Day
P-3 Timeline:
0600: Show at Hangar
~0800: Takeoff
ETA Bangor ~ 0130 EST
ETA WFF ~1630 EST, depending on customs.
C-130 Timeline:
0700: Show at Hangar
0700: Fuel as soon as able, following P-3
0715: LM QNC Brief
0740: Doors Close
0750: Engine Start
~0815: Est. takeoff time
(expect 1h+00 on deck followed by 1h+30 to Wallops)
ETA BTV ~ 1400 EST
ETA WFF ~ 1630 EST
POD August 15, 2024 - Flight Day (SF#9 P-3, SF#10 LearJet, SF#5 G-III)
All:
0415 - Go No-Go (WhatsApp message, Flight Ops Channel)
1600 - Flight Debrief (Hangar 8 conference room)
P-3 Schedule:
0430 - P-3 Power and Instrument Access (if No-go revert to 0800-1600 access)
0700 - Preflight Briefing (Hangar 8 conference room)
0720 - Doors Close
0800 - Takeoff
~TBD - Landing (approximate time)
1600 - Flight Debrief Brief (Hangar 8 conference room)
Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.