PACE-PAX 08/21/24 Mission Daily Schedule

NASA – PACE-PAX Plan of the Day
Wednesday 21 August 2024 (all times PDT)

NASA ER-2 
0600 - 1200:  Pressure test, no aircraft access (pods that are in the lab will not be pressurized)
~1200-1530: Aircraft access

CIRPAS Twin Otter 
The LARGE team is onsite setting up ground site observation instruments in the tower.

Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530 
2. Please refer to the PACE-PAX Deployment Guide for information

Reminders:
AFRC:  
-Please do not take photos of the flight line or inside the hangar
-Please use the WhatsApp FNE group to coordinate with your escorts.
-AFRC and ESPO can assist with movement between the different locations.
-Escorts are required in the lab, breakroom and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.
-Escorts are available Monday through Friday during ER-2 access hours. Support outside these times require pre-coordination with ESPO.

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.