Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

Associated content: 

From left: Dan Heckel & Ali Ma

Justin Jacquot, Xiaoli Shen

Justin Jacquot, Dan Czizco, Mike Kapitzke, and Tyler Latsha

Michael Litchfield, Dan Czizco, Frank Lightborn

DCOTSS 05/07/21 Mission Daily Schedule

0700 - 1500 Lab access 
0800 - 1500 A/C crew support (or, as long as needed)
Achievements and goals
 
PALMS 
-- troubleshoot A/C power cable pinout
-- successfully powered up from 120V supply
-- repositioned two top components, eliminated all mechanical interferences. 
-- test powering up from the EIP (i.e., aircraft power simulator) 
 
DPOPS
-- DPOPS plumbing work
-- continue plumbing manifold work tomorrow
 
MMS
-- integration work in the fixed nose area (on the aircraft)

DCOTSS 05/06/21 Mission Daily Schedule

0700 - 1500 ER2 Crew Support
 
Achievements and goals

DCOTSS 05/05/21 Mission Daily Schedule

0700 - 1500 ER2 support 
0700 -- ER2 nose duct work
0700 -- PALMS & DPOPS (two FN escorts)
0900 -- PALMS fit check

DCOTSS 05/04/21 Mission Daily Schedule

0700 - 1500 Lab access, A/C crew support
1130 - 1230 A/C crew lunch break

DCOTSS 05/03/21 Mission Daily Schedule

The Plan of the Day (POD) for tomorrow May 3rd:
·       0700 DAN CZICZO (PALMS): Arriving for Badge Enrollment CAITLIN MURPHY (ESPO): Arriving for Badge Enrollment
·       0715 JUSTIN JACQUOT (PALMS): Escorted by Caitlin Murphy Arriving for Badge Enrollment

Pages

Subscribe to RSS - DCOTSS