Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

DCOTSS 05/07/21 Mission Daily Schedule

0700 - 1500 Lab access 
0800 - 1500 A/C crew support (or, as long as needed)
Achievements and goals
 
PALMS 
-- troubleshoot A/C power cable pinout
-- successfully powered up from 120V supply
-- repositioned two top components, eliminated all mechanical interferences. 
-- test powering up from the EIP (i.e., aircraft power simulator) 
 
DPOPS
-- DPOPS plumbing work
-- continue plumbing manifold work tomorrow
 
MMS
-- integration work in the fixed nose area (on the aircraft)
--built new cables
 
Other
Today, LA county moved to the yellow tier. This is good news as far as total COVID-19 case numbers, however, no expected changes to our working conditions.