Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Current Plan for today is Post-flight and Preflight:
-0700: Request GH Crew assist NOAA H2O to be removed from Aircraft
-0730: Daily ATTREX/GH Leads mtg in Hangar
-0800 – 1000: Aircraft outside for Satcom testing with DFRC GHOC
-1000 – 1400: Science Preflight with Aircraft VTC and Data-IT support
o Post-flight/Preflight as needed most instruments
- 1930 – 2230: Science Pre-launch Preflight (no VTC Power or IT support)
o Evening Pre-flight schedule for DOAS, DLH, PCRS, NOAA H2O is:
- 2230: GH Crew arrives for Aircraft prep.
Current Plan for Friday is Science Flt #4 with the following proposed schedule:
-T-0 Briefing at 0130 in the Hangar
oPMOF Staffing @ 0215
- Engine Start @ 0230
oPin Pull @ 0250
- Takeoff @ ~0315 (1715 Z, Tuesday)
- Landing @ 2015 (17-hr flight)