PACE-PAX 08/29/24 Mission Daily Schedule

Meetings (all times PDT):
0900:  Weather Briefing, Mission Status and Flight Planning Meeting (AFRC: 1731 Conf. Room)
1300:  ER-2 Weather Brief (AFRC: 1731 Conf. Room)

NASA ER-2: Check Flight 2
0600: Preflight Science Weather Briefing (Teams and 1731)
0630: Instruments Hands On
0700: Mission Briefing ER-2 Go/NoGo (Teams and Lab 1731)
*NOTE: A representative from each instrument must be present*
0730: Instrument Hands Off / ER-2 Tow out
1000: ER-2 Check Flight Takeoff
1300: Landing
1345: Flight Debrief
1530: Access Ends

CIRPAS Twin Otter 
0800:  Hangar Access
TBD: Afternoon Test Flight

Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530 
2. Please refer to the PACE-PAX Deployment Guide for information on WhatsApp groups

Reminders:
AFRC:  Please do not take photos of the flight line or inside the hangar.
AFRC: Please use the WhatsApp FNE group to coordinate with your escorts.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom, and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.
Escorts are available Monday through Friday during ER-2 access hours. Support outside these times require pre-coordination with ESPO.

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.