NASA – PACE-PAX Plan of the Day
Wednesday 21 August 2024 (all times PDT)
NASA ER-2
0600 - 1200: Pressure test, no aircraft access (pods that are in the lab will not be pressurized)
~1200-1530: Aircraft access
CIRPAS Twin Otter
The LARGE team is onsite setting up ground site observation instruments in the tower.
Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530
2. Please refer to the PACE-PAX Deployment Guide for information
Reminders:
AFRC:
-Please do not take photos of the flight line or inside the hangar
-Please use the WhatsApp FNE group to coordinate with your escorts.
-AFRC and ESPO can assist with movement between the different locations.
-Escorts are required in the lab, breakroom and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.
-Escorts are available Monday through Friday during ER-2 access hours. Support outside these times require pre-coordination with ESPO.
