Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
28 |
29 |
30 |
31 |
|||
«
ND/MAX Deployment - ARMD
2018-01-13 - 2018-02-04
»
|
||||||
«
HyspIRI HyTES Hawaii Deployment (H3C)
2018-01-17 - 2018-02-20
»
|
||||||
«
809 CARE Structural Modification (LM Site 2)
2017-08-21 - 2018-02-12
»
|
||||||
«
Major Ops Inspection [Place Holder]
2017-11-09 - 2018-03-23
»
|
||||||
«
Annual Maintenance
2017-11-27 - 2018-03-11
»
|
||||||
«
Annual Maintenance
2017-12-04 - 2018-03-11
»
|
||||||
«
Phase Inspection
2017-12-19 - 2018-02-16
»
|
||||||
«
Paint
2018-01-03 - 2018-02-02
|
Maintenance, Phase I
2018-02-03 - 2018-02-13
»
|
|||||
«
Block 10 system checkout
2018-01-16 - 2018-02-07
»
|
||||||
«
Operation Ice Bridge - Upload
2018-01-22 - 2018-02-15
»
|
||||||
|
UAVSAR Local Flights
2018-01-29 - 2018-02-21
»
|
|||||
Pilot Proficiency Flights
2018-01-29 - 2018-02-02
|
|
|||||
|
|
|
|
|
||
«
ND/MAX Deployment - ARMD
2018-01-13 - 2018-02-04
|
NAAMES - Upload
2018-02-05 - 2018-03-02
»
|
|||||
«
HyspIRI HyTES Hawaii Deployment (H3C)
2018-01-17 - 2018-02-20
»
|
||||||
«
809 CARE Structural Modification (LM Site 2)
2017-08-21 - 2018-02-12
»
|
||||||
«
Major Ops Inspection [Place Holder]
2017-11-09 - 2018-03-23
»
|
||||||
«
Annual Maintenance
2017-11-27 - 2018-03-11
»
|
||||||
«
Annual Maintenance
2017-12-04 - 2018-03-11
»
|
||||||
«
Phase Inspection
2017-12-19 - 2018-02-16
»
|
||||||
«
Block 10 system checkout
2018-01-16 - 2018-02-07
|
No Chase COA - System Check-out
2018-02-08 - 2018-02-16
»
|
|||||
«
Maintenance, Phase I
2018-02-03 - 2018-02-13
»
|
||||||
«
UAVSAR Local Flights
2018-01-29 - 2018-02-21
»
|
||||||
«
Operation Ice Bridge - Upload
2018-01-22 - 2018-02-15
»
|
||||||
|
ND/MAX Download
2018-02-05 - 2018-02-08
|
|
|
|||
Doppler Scatt Installation & Testing
2018-02-05 - 2018-02-16
»
|
||||||
|
|
|
||||
«
HyspIRI HyTES Hawaii Deployment (H3C)
2018-01-17 - 2018-02-20
»
|
||||||
«
809 CARE Structural Modification (LM Site 2)
2017-08-21 - 2018-02-12
|
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
|||||
«
Major Ops Inspection [Place Holder]
2017-11-09 - 2018-03-23
»
|
||||||
«
Annual Maintenance
2017-11-27 - 2018-03-11
»
|
||||||
«
Annual Maintenance
2017-12-04 - 2018-03-11
»
|
||||||
«
Phase Inspection
2017-12-19 - 2018-02-16
|
|
|||||
«
Maintenance, Phase I
2018-02-03 - 2018-02-13
|
Fuel Tank Repair
2018-02-14 - 2018-03-09
»
|
|||||
«
UAVSAR Local Flights
2018-01-29 - 2018-02-21
»
|
||||||
«
No Chase COA - System Check-out
2018-02-08 - 2018-02-16
|
|
|||||
«
Operation Ice Bridge - Upload
2018-01-22 - 2018-02-15
|
|
|
||||
«
NAAMES - Upload
2018-02-05 - 2018-03-02
»
|
||||||
«
Doppler Scatt Installation & Testing
2018-02-05 - 2018-02-16
|
|
|||||
|
Fuel Tank Leak Repairs
2018-02-12 - 2018-02-17
|
|||||
Larsen - Pilot Proficiency Flights
2018-02-12 - 2018-02-13
|
Larsen Camera Mission - Upload
2018-02-14 - 2018-02-16
|
|
||||
Training Flights for GRC Pilot
2018-02-12 - 2018-02-13
|
Currency Flights
2018-02-14 - 2018-02-16
|
|
||||
Triple Pulsed IPDA 2-Micron Lidar
2018-02-12 - 2018-03-06
»
|
||||||
|
|
|
|
|
||
«
HyspIRI HyTES Hawaii Deployment (H3C)
2018-01-17 - 2018-02-20
|
FAA Safety Risk Management Panel
2018-02-21 - 2018-02-22
|
Direct Return
2018-02-23 - 2018-02-28
»
|
||||
«
Major Ops Inspection [Place Holder]
2017-11-09 - 2018-03-23
»
|
||||||
«
Annual Maintenance
2017-11-27 - 2018-03-11
»
|
||||||
«
Annual Maintenance
2017-12-04 - 2018-03-11
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Fuel Tank Repair
2018-02-14 - 2018-03-09
»
|
||||||
«
UAVSAR Local Flights
2018-01-29 - 2018-02-21
|
|
|
Larsen Camera Mission - Transit
2018-02-24 - 2018-02-28
»
|
|||
«
Triple Pulsed IPDA 2-Micron Lidar
2018-02-12 - 2018-03-06
»
|
||||||
«
NAAMES - Upload
2018-02-05 - 2018-03-02
»
|
||||||
|
1A,2A,4A,8A Check Maintenance
2018-02-19 - 2018-03-08
»
|
|||||
|
Pilot Proficiency Flights
2018-02-20 - 2018-02-22
|
|
||||
HyspIRI HyTES Hawaii Download (H3C)
2018-02-20 - 2018-02-22
|
||||||
1 |
2 |
3 |
||||
«
Direct Return
2018-02-23 - 2018-02-28
|
Maintenance/Airborne Science Modifications
2018-03-01 - 2018-05-11
»
|
|||||
«
Larsen Camera Mission - Transit
2018-02-24 - 2018-02-28
|
|
|
Larsen Camera Mission
2018-03-03 - 2018-03-22
»
|
|||
«
Major Ops Inspection [Place Holder]
2017-11-09 - 2018-03-23
»
|
||||||
«
Annual Maintenance
2017-11-27 - 2018-03-11
»
|
||||||
«
Annual Maintenance
2017-12-04 - 2018-03-11
»
|
||||||
«
809 CARE Reassembly
2018-02-13 - 2019-06-13
»
|
||||||
«
Fuel Tank Repair
2018-02-14 - 2018-03-09
»
|
||||||
«
1A,2A,4A,8A Check Maintenance
2018-02-19 - 2018-03-08
»
|
||||||
«
Triple Pulsed IPDA 2-Micron Lidar
2018-02-12 - 2018-03-06
»
|
||||||
«
NAAMES - Upload
2018-02-05 - 2018-03-02
|
|
|||||
|
SIERRA-B Flight Testing
2018-02-26 - 2018-04-13
»
|
|||||
Doppler Scatt Flights
2018-02-26 - 2018-03-23
»
|
||||||
|
OMG, GLISTIN-A
2018-02-27 - 2018-03-25
»
|
|||||
P-band Integration
2018-02-28 - 2018-03-26
»
|
||||||
|
Page Last Updated: April 22, 2017
Page Editor: Brad Bulger
NASA Official: Marilyn Vasques
Website Issues: Contact Us