Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
30 |
||||||
«
Operation Ice Bridge
2017-03-07 - 2017-05-13
»
|
||||||
«
Block 10 Standup
2015-10-01 - 2017-05-12
»
|
||||||
«
MAJOR INSPECTION
2016-12-08 - 2017-07-14
»
|
||||||
«
Avionics and Radar Upgrade (B200)
2017-03-21 - 2017-06-14
»
|
||||||
«
Annual Maintenance
2017-04-17 - 2017-06-23
»
|
||||||
«
GOES-R Phase II Deployment
2017-04-10 - 2017-05-20
»
|
||||||
«
Airborne Science Modifications
2017-04-11 - 2017-06-30
»
|
||||||
«
CPEX Upload
2017-04-17 - 2017-05-24
»
|
||||||
«
UAV TM Tech Demo Upload
2017-04-17 - 2017-06-09
»
|
||||||
|
Ejection Seat Inspection/NASDAT replacement
2017-05-01 - 2017-05-08
»
|
|||||
AFRC Programmable Autopliot Phase 2&3 Flights
2017-05-01 - 2017-05-04
|
|
|
||||
MISTiC Winds Upload
2017-05-01 - 2017-05-04
|
|
|
||||
|
Garmin 1000 Autopilot and Cockpit Upgrades
2017-05-03 - 2017-06-01
»
|
|||||
CARAFE - PTF
2017-05-03 - 2017-05-05
|
|
|||||
|
|
|||||
«
Operation Ice Bridge
2017-03-07 - 2017-05-13
|
||||||
«
Block 10 Standup
2015-10-01 - 2017-05-12
|
|
|||||
«
MAJOR INSPECTION
2016-12-08 - 2017-07-14
»
|
||||||
«
Avionics and Radar Upgrade (B200)
2017-03-21 - 2017-06-14
»
|
||||||
«
Annual Maintenance
2017-04-17 - 2017-06-23
»
|
||||||
«
Ejection Seat Inspection/NASDAT replacement
2017-05-01 - 2017-05-08
|
Maintenance / Upgrades / Mods / Repair
2017-05-09 - 2017-06-07
»
|
|||||
«
Garmin 1000 Autopilot and Cockpit Upgrades
2017-05-03 - 2017-06-01
»
|
||||||
«
GOES-R Phase II Deployment
2017-04-10 - 2017-05-20
»
|
||||||
«
Airborne Science Modifications
2017-04-11 - 2017-06-30
»
|
||||||
«
CPEX Upload
2017-04-17 - 2017-05-24
»
|
||||||
«
UAV TM Tech Demo Upload
2017-04-17 - 2017-06-09
»
|
||||||
|
CARAFE - Science Flights
2017-05-08 - 2017-05-25
»
|
|||||
PV Flights
2017-05-09 - 2017-05-17
»
|
||||||
MISTiC Winds Flights (PV piggyback)
2017-05-09 - 2017-05-17
»
|
||||||
USN TPS DT-11A [PLACE HOLDER]
2017-05-10 - 2017-05-18
»
|
||||||
|
|
ABoVE, P-band Radar
2017-05-12 - 2017-06-08
»
|
||||
|
||||||
«
USN TPS DT-11A [PLACE HOLDER]
2017-05-10 - 2017-05-18
|
|
|
||||
«
MAJOR INSPECTION
2016-12-08 - 2017-07-14
»
|
||||||
«
Avionics and Radar Upgrade (B200)
2017-03-21 - 2017-06-14
»
|
||||||
«
Annual Maintenance
2017-04-17 - 2017-06-23
»
|
||||||
«
Garmin 1000 Autopilot and Cockpit Upgrades
2017-05-03 - 2017-06-01
»
|
||||||
«
Maintenance / Upgrades / Mods / Repair
2017-05-09 - 2017-06-07
»
|
||||||
«
PV Flights
2017-05-09 - 2017-05-17
|
|
|
|
|||
«
MISTiC Winds Flights (PV piggyback)
2017-05-09 - 2017-05-17
|
|
|
|
|||
«
GOES-R Phase II Deployment
2017-04-10 - 2017-05-20
|
||||||
«
CARAFE - Science Flights
2017-05-08 - 2017-05-25
»
|
||||||
«
ABoVE, P-band Radar
2017-05-12 - 2017-06-08
»
|
||||||
«
Airborne Science Modifications
2017-04-11 - 2017-06-30
»
|
||||||
«
CPEX Upload
2017-04-17 - 2017-05-24
»
|
||||||
«
UAV TM Tech Demo Upload
2017-04-17 - 2017-06-09
»
|
||||||
Post Mission Maintenance
2017-05-15 - 2017-05-26
»
|
||||||
Great Lakes Air Quality
2017-05-15 - 2017-06-30
»
|
||||||
ORACLES - NOAA Pylon Assembly and Installation
2017-05-15 - 2017-05-29
»
|
||||||
|
|
|||||
«
MAJOR INSPECTION
2016-12-08 - 2017-07-14
»
|
||||||
«
Avionics and Radar Upgrade (B200)
2017-03-21 - 2017-06-14
»
|
||||||
«
Annual Maintenance
2017-04-17 - 2017-06-23
»
|
||||||
«
Garmin 1000 Autopilot and Cockpit Upgrades
2017-05-03 - 2017-06-01
»
|
||||||
«
Maintenance / Upgrades / Mods / Repair
2017-05-09 - 2017-06-07
»
|
||||||
«
Post Mission Maintenance
2017-05-15 - 2017-05-26
|
|
|||||
«
CARAFE - Science Flights
2017-05-08 - 2017-05-25
|
|
|
||||
«
ABoVE, P-band Radar
2017-05-12 - 2017-06-08
»
|
||||||
«
Great Lakes Air Quality
2017-05-15 - 2017-06-30
»
|
||||||
«
Airborne Science Modifications
2017-04-11 - 2017-06-30
»
|
||||||
«
CPEX Upload
2017-04-17 - 2017-05-24
|
CPEX Deployment
2017-05-25 - 2017-06-28
»
|
|||||
«
UAV TM Tech Demo Upload
2017-04-17 - 2017-06-09
»
|
||||||
«
ORACLES - NOAA Pylon Assembly and Installation
2017-05-15 - 2017-05-29
»
|
||||||
|
Battery Capacity Check
2017-05-22 - 2017-05-25
|
|
|
|||
GOES-R Phase II Download
2017-05-22 - 2017-05-26
|
||||||
|
|
|
||||
1 |
2 |
3 |
||||
«
MAJOR INSPECTION
2016-12-08 - 2017-07-14
»
|
||||||
«
Avionics and Radar Upgrade (B200)
2017-03-21 - 2017-06-14
»
|
||||||
«
Annual Maintenance
2017-04-17 - 2017-06-23
»
|
||||||
«
Garmin 1000 Autopilot and Cockpit Upgrades
2017-05-03 - 2017-06-01
|
|
|
||||
«
Maintenance / Upgrades / Mods / Repair
2017-05-09 - 2017-06-07
»
|
||||||
«
ABoVE, P-band Radar
2017-05-12 - 2017-06-08
»
|
||||||
«
Great Lakes Air Quality
2017-05-15 - 2017-06-30
»
|
||||||
«
CPEX Deployment
2017-05-25 - 2017-06-28
»
|
||||||
«
Airborne Science Modifications
2017-04-11 - 2017-06-30
»
|
||||||
«
UAV TM Tech Demo Upload
2017-04-17 - 2017-06-09
»
|
||||||
«
ORACLES - NOAA Pylon Assembly and Installation
2017-05-15 - 2017-05-29
|
Pilot Proficiency Flights
2017-05-30 - 2017-06-01
|
|
|
|||
|
|
SARP - Upload
2017-05-30 - 2017-06-09
»
|
||||
ORACLES - Upload
2017-05-30 - 2017-07-06
»
|
||||||
|
|
|
Page Last Updated: April 22, 2017
Page Editor: Brad Bulger
NASA Official: Marilyn Vasques
Website Issues: Contact Us