[Pace-pax] Today's PACE-PAX meeting notes

Knobelspiesse, Kirk D. (GSFC-6160) kirk.d.knobelspiesse at nasa.gov
Mon May 9 14:44:59 PDT 2022


Hi everybody,

Thanks for dialing in to today's PACE-PAX meeting. A recording is available to those within the NASA firewall here:
[https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fres-2.cdn.office.net%2Fassets%2Fmail%2Ffile-icon%2Fpng%2Fvideo_16x16.png&data=05%7C01%7Cpace-pax%40espo.nasa.gov%7C8132403a7b98461f963708da32053524%7C7005d45845be48ae8140d43da96dd17b%7C0%7C0%7C637877295196571653%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=gstZ01qD%2BEMlUOPkVvPlVXreSVF%2B7cNJHlxtF0at6LY%3D&reserved=0]PACE-PAX tagup-20220509_120114-Meeting Recording.mp4<https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fnasa-my.sharepoint.com%2F%3Av%3A%2Fg%2Fpersonal%2Fkknobels_ndc_nasa_gov%2FEXIyU5gBtYpArGa6I6QdqvQBKz84_ndmcOWhA8TwgCc7Uw&data=05%7C01%7Cpace-pax%40espo.nasa.gov%7C8132403a7b98461f963708da32053524%7C7005d45845be48ae8140d43da96dd17b%7C0%7C0%7C637877295196571653%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=GfqnKCyNJ5gLlihOA6xNc9bWsjn%2BjtzDSVFPHUV0kHA%3D&reserved=0>

Our next meeting is scheduled for monday June 20th at noon EDT. We may need to meet before then to get the statements of work and budgets ready. Stay tuned.

Notes for the meeting are attached, and also copy-pasted below. Also see our shared file repository here: https://espo.nasa.gov/pace-pax/shared-files/83161/general

Thanks!
Kirk



Kirk D. Knobelspiesse (he/him/his)

NASA Goddard Space Flight Center, Ocean Ecology Laboratory

https://science.gsfc.nasa.gov/sed/bio/kirk.d.knobelspiesse
https://pace.gsfc.nasa.gov
https://aos.gsfc.nasa.gov




PACE-PAX tag up notes
May 9, 2022

Today’s topics

  *   Statement of work information gathering
  *   In situ aircraft instrument configuration



A recording of the meeting is available to those within the NASA firewall here: https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fnasa-my.sharepoint.com%2F%3Av%3A%2Fg%2Fpersonal%2Fkknobels_ndc_nasa_gov%2FEXIyU5gBtYpArGa6I6QdqvQBKz84_ndmcOWhA8TwgCc7Uw&data=05%7C01%7Cpace-pax%40espo.nasa.gov%7C8132403a7b98461f963708da32053524%7C7005d45845be48ae8140d43da96dd17b%7C0%7C0%7C637877295196571653%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=GfqnKCyNJ5gLlihOA6xNc9bWsjn%2BjtzDSVFPHUV0kHA%3D&reserved=0<https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fnasa-my.sharepoint.com%2F%3Av%3A%2Fg%2Fpersonal%2Fkknobels_ndc_nasa_gov%2FEXIyU5gBtYpArGa6I6QdqvQBKz84_ndmcOWhA8TwgCc7Uw&data=05%7C01%7Cpace-pax%40espo.nasa.gov%7C8132403a7b98461f963708da32053524%7C7005d45845be48ae8140d43da96dd17b%7C0%7C0%7C637877295196727883%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=oH3QKXzvuVKIS1QEHEV3nkL1xSXyYLsazklPQxfrdlo%3D&reserved=0>



Website, mailing list, and your team
The PACE-PAX mailing list is: pace-pax at espo.nasa.gov<mailto:pace-pax at espo.nasa.gov>. Please ensure your entire team is on the list by checking our website here: https://espo.nasa.gov/pace-pax/node/83161/group_mailing-lists   If somebody is missing, please email erin.czech at nasa.gov<mailto:erin.czech at nasa.gov>



Statement of work information gathering

I recently sent a template for information gathering about instrument requirements for each team. This will be used to generate statements of work and ultimately budgets. Thanks to those who responded. I’ll be keeping a version of this document (and Excel file) here:



https://espo.nasa.gov/pace-pax/content/Planning



Stepping through the contents of the document:



-shipping: Erin C – this should contain what’s needed to get instrumentation from the home institution to/from AFRC (or Monterey). Any subsequent shipping will be managed by ESPO. Kirk – in our particular case we don’t intend to relocate from AFRC / Monterey, but this is good to know in case we change plans.



-integration: John H – should we expect staggered integration? Fran B – plan for a 2 week period of integration, perhaps with a bit of staggering. John H notes that much of the material will be required by the PIF for AFRC Kirk – understood… it will make filling out the PIF easier.



-supporting engineering: John H – will the budget cover supporting engineering related costs? Kirk – supporting if it is needed to deploy for PACE-PAX, yes. Please identify these things in the budget. AirMSPI and PICARD teams also note potential need for engineering. Fran B – contacts at AFRC for that are:

tyler.s.latsha at nasa.gov;

mike.s.kapitzke at nasa.gov;

-ground site based calibration: The statement of work document requests information about associated calibration needs. In addition, we need to know if teams will benefit from overflights of the calibration site at Railroad Valley, and if augmentation to the instrumentation at that site are needed. Alternatively, overflights of locations closer to AFRC and JPL could be considered. For more details see: https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdoi.org%2F10.1117%2F1.JRS.15.034501&data=05%7C01%7Cpace-pax%40espo.nasa.gov%7C8132403a7b98461f963708da32053524%7C7005d45845be48ae8140d43da96dd17b%7C0%7C0%7C637877295196727883%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=TtEdwY42ep3olUo%2BK0o7pMxaLS1yXgf%2F3q0n2LKsOmk%3D&reserved=0<https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdoi.org%2F10.1117%2F1.JRS.15.034501&data=05%7C01%7Cpace-pax%40espo.nasa.gov%7C8132403a7b98461f963708da32053524%7C7005d45845be48ae8140d43da96dd17b%7C0%7C0%7C637877295196727883%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=TtEdwY42ep3olUo%2BK0o7pMxaLS1yXgf%2F3q0n2LKsOmk%3D&reserved=0>



Next meeting we’ll discuss this in more detail



A schedule and plan for data delivery deadlines is needed to fully realize a SOW and budget. The PACE-PAX management team will determine these deadlines by the end of next week





In situ aircraft options



Brian C gave a presentation discussing additional measurements that are needed in the CIRPAS twin otter beyond the facility instrument suite. Those slides can be found here:



https://espo.nasa.gov/pace-pax/content/PACE-PAX_Presentations



Anthony B – more instruments than facility instruments alone can be considered



Brian C - Concerns with existing payload given validation focus of PACE-PAX

  *   Absorption
     *   Accuracy and extending into blue/UV
  *   Size distribution
     *   Needed for ambient conditions and large particle cutoffs need to be quantified
  *   Real refractive index
     *   Part of polarimeter retrievals that is only weakly constrained by closure using nephelometers and size distribution



Kirk – we need to trace the measurements to the VTM, and identify a person or people to take the insitu data and turn it into something that can be used for validation



Bastiaan – can PCASP be run with the heaters off to understand role of relative humidity? Is there data on influence of heaters on and off for relative humidity?



(more discussion in email)



Attendance report and chat window info below:

[12:17 PM] Turner, Woody (HQ-DK000)
Sorry but what's the aircraft again for PACE-PAX? ER-2--see it on the spreadsheet--and Fran's on the line.

[12:21 PM] Brian Cairns (Guest)
ER-2 and an in situ aircraft. Current thought for in situ is CIRPAS Twin Otter since it could be based out of Monterey to keep costs down.

[12:23 PM] Turner, Woody (HQ-DK000)
Thanks Brian.

[12:38 PM] Becker, Franzeska H. (AFRC-320)
tyler.s.latsha at nasa.gov;
mike.s.kapitzke at nasa.gov;

[12:39 PM] Lorenzoni, Laura (HQ-DK000)
For data, we'll be looking for a quick delivery
like 1

[12:39 PM] Lorenzoni, Laura (HQ-DK000)
Quicker than usual, but we need to understand from the airborne team what is possible






Fung, Yau Ho (GISS-6110)[GSFC INTERNS]
Knobelspiesse, Kirk D. (GSFC-6160)
Caitlin Murphy (Guest)
Cetinic, Ivona (GSFC-616.0)[MORGAN STATE UNIV.]
Jacobson, James Daniel. (ARC-SG)[Bay Area Environmental Research Institute]
Choi, Samuel K. (AFRC-320)
Cook, Anthony L. (LARC-D211)
Vanderlei Martins
Czech, Erin P. (ARC-SGG)
Collister, Brian (LARC-E304)[Oak Ridge Associated Universities]
Lorraine (Guest)
Ueyama, Rei (ARC-SGG)
Hair, Johnathan W. (LARC-E304)
David R Thompson (JPL) (Guest)
Bastiaan van Diedenhoven (Guest)
Stamnes, Snorre A. (LARC-E304)
Becker, Franzeska H. (AFRC-320)
Meyer, Kerry G. (GSFC-6130)
Ferrare, Richard A. (LARC-E304)
Lorenzoni, Laura (HQ-DK000)
Werdell, Jeremy (GSFC-6160)
Harper, David B. (LARC-D211)
Martijn Smit (Guest)
Jeroen Rietjens
Dominguez, Roseanne T. (ARC-SG)[Bay Area Environmental Research Institute]
Hal Maring (Guest)
Hostetler, Chris A. (LARC-E304)
Turner, Woody (HQ-DK000)
Shingler, Taylor J. (LARC-E303)
Chowdhary, Jacek (GISS-611.0)[TRUSTEES OF COLUMBIA UNIVERSITY]
Proctor, Chris (GSFC-616.0)[SCIENCE SYSTEMS AND APPLICATIONS INC]
Otto (Guest)
Brian Cairns (Guest)
Bucholtz, Anthony (CIV)




-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://espo.nasa.gov/pipermail/pace-pax/attachments/20220509/38b67942/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: PACE-PAX_mtg20220509.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 28002 bytes
Desc: PACE-PAX_mtg20220509.docx
URL: <http://espo.nasa.gov/pipermail/pace-pax/attachments/20220509/38b67942/attachment-0001.docx>


More information about the pace-pax mailing list