[Korus-aq-updates] KORUS Plan for April 5
Vasques, Marilyn F. (ARC-SGG)
marilyn.vasques at nasa.gov
Mon Apr 4 14:58:03 PDT 2016
PLAN FOR 4/5:
0700 - 1700: Instrument Integration SAGA, HR-AMS, CAMS, LARGE, DIAL, K-AMS, K-CCN, K-SP2, PTR-MS
END OF THE DAY REPORT:
DC-8:
SAGA: Instrument fully installed. Power check complete.
HR-AMS: Instrument installed.
CAMS: Instrument installed.
LARGE: Power test complete. Installation underway.
DIAL: Instrument installed.
K-AMS: Ready for installation
K-SP2: Realignment of laser today, plan to mount tomorrow
PTR-MS: Plan to install on Wednesday
K-CCN, CAFS and CIT-CIMS just arrived.
NOTES:
1pm debrief in lab every day except Saturday and Sunday.
LaRC B200: (by Craig Clekner)
• Excellent progress today and over the weekend. With respect to the avionics upgrades, the aircraft is flyable and can deploy. Ted is continuing to work a few small issues.
• The aircraft has been defueled in preparation for weight and balance.
• Calibration of the pitot-static systems has been completed.
• Compass swing of the aircraft has been completed.
• An initial pressurization check has uncovered some leaks (not unexpected). Sealant is curing and we hope to do a final check tomorrow.
• We are shooting for the Flight Readiness Review (FRR) Tuesday afternoon, with Functional Check Flight (FCF) to follow weather permitting. FCF could slip into Wednesday morning.
• Ball personnel and GEOTASO are planning to arrive on Tuesday; pallet install, instrument install, & checkout will commence ASAP after FCF. Late shifts / long shifts will be used where practical.
• ICF window has shifted. Potential dates are on look-ahead and could extend until April 11th
-- Marilyn Vasques
ESPO Director
NASA Ames Research Center
MOBILE: 650-417-8796
OFFICE: 650-604-6120
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://espo.nasa.gov/pipermail/korus-aq-updates/attachments/20160404/96b0ac8c/attachment-0002.html>
More information about the korus-aq-updates
mailing list