ER-2 IMPACTS Team,
At the ER-2 Debrief following the ferry flight from KPMD to KPOB, the pilot in command noted an error in sequence for the MVIS Computer. Changes related to the MVIS Computer and other minor structural edits throughout have been updated in the v1.3 checklist attached.
Instrument representatives please provide review and any comments by COB tomorrow.
Thank You!
Tyler
Tyler S. Latsha
Operations Engineer, NASA ER-2S
Armstrong Flight Research Center
tyler.s.latsha at nasa.gov<mailto:tyler.s.latsha at nasa.gov>
From: Hobbs, Brian L. (AFRC-320) <brian.l.hobbs at nasa.gov>
Sent: Friday, January 7, 2022 8:31 AM
To: IMPACTS ER2 ESPO <impacts-er-2 at espo.nasa.gov>
Cc: Alvarez, Juan M. (AFRC-424) <juan.m.alvarez at nasa.gov>; Alvarez-Alonzo, Darick (AFRC-424)[Vertex Aerospace LLC] <darick.alvarez-alonzo at nasa.gov>; Bantilan, Gregory M. (AFRC-421)[Vertex Aerospace LLC] <gregory.m.bantilan at nasa.gov>; Barr, Joseph R. (AFRC-423) <joseph.r.barr at nasa.gov>; Bereda,wendy (AFRC-220)[KAY & ASSOCIATES INC] <wendy.bereda at nasa.gov>; Broce, Donald Stuart. (AFRC-410)[Integration Innovation, Inc.] <donald.s.broce at nasa.gov>; Bryant, Johnny F. (AFRC-421)[Vertex Aerospace LLC] <johnny.f.bryant at nasa.gov>; Caldwell, Kirk (AFRC-730) <kirk.caldwell-1 at nasa.gov>; Carlson, Torin L. (AFRC-424)[KAY & ASSOCIATES INC] <torin.carlson-1 at nasa.gov>; Cortes, Raul E. (AFRC-423) <raul.e.cortes at nasa.gov>; Dobbins, Jerry K. (AFRC-424) <jerry.dobbins-1 at nasa.gov>; Dorval, Michael R. (AFRC-421) <michael.r.dorval at nasa.gov>; Dunwoody, Kent (ARC-320)[Bay Area Environmental Research Institute] <kent.n.dunwoody at nasa.gov>; gary hoffmann <hoffmann at baeri.org>; Habbal, Wissam (AFRC-710) <wissam.m.habbal at nasa.gov>; Heckel, Daniel C. (AFRC-424)[Vertex Aerospace LLC] <daniel.c.heckel at nasa.gov>; Henderson, Bobby J. (AFRC-421)[Vertex Aerospace LLC] <bobby.j.henderson at nasa.gov>; Hobbs, Brian L. (AFRC-320) <brian.l.hobbs at nasa.gov>; Hoffmann, Gary D. (ARC-SG)[Bay Area Environmental Research Institute] <gary.d.hoffmann at nasa.gov>; Johnson, Elena N. (AFRC-111)[MEDIA FUSION INCORPORATED] <elena.n.johnson at nasa.gov>; Kapitzke, Mike S. (AFRC-430) <mike.s.kapitzke at nasa.gov>; Kinn, Patricia M. (AFRC-410) <patricia.m.kinn at nasa.gov>; Klein, Walter E. (AFRC-410) <walter.e.klein at nasa.gov>; Koertge, Stephen D. (AFRC-410)[Integration Innovation, Inc.] <stephen.d.koertge at nasa.gov>; Struckman, Michael W. (AFRC-424)[Vertex Aerospace LLC] <michael.w.struckman at nasa.gov>; Kraft, Kevin (AFRC-220)[KAY & ASSOCIATES INC] <kevin.kraft-1 at nasa.gov>; Latsha, Tyler S. (AFRC-430) <tyler.s.latsha at nasa.gov>; Lloyd, Patrick M. (AFRC-424) <patrick.m.lloyd at nasa.gov>; Ma, Alistair F. (AFRC-424) <alistair.f.ma at nasa.gov>; Mathieson, Edward (AFRC-424)[KAY & ASSOCIATES INC] <edward.mathieson-1 at nasa.gov>; McCarahan, Jon (AFRC-424)[KAY & ASSOCIATES INC] <jon.mccarahan at nasa.gov>; Miles, Wason K. (AFRC-423)[Vertex Aerospace LLC] <wason.k.miles at nasa.gov>; Mitchell, Alvin C. (AFRC-710) <alvin.c.mitchell at nasa.gov>; Neeley, Howard DEAN (AFRC-410)[Integration Innovation, Inc.] <howard.d.neeley at nasa.gov>; Nelson, James G. (AFRC-410)[Integration Innovation, Inc.] <james.g.nelson at nasa.gov>; Norlin, Ken A. (AFRC-320) <ken.a.norlin at nasa.gov>; Nystrom, Jan V. (AFRC-410)[Integration Innovation, Inc.] <jan.v.nystrom at nasa.gov>; Orellana, Jesse F. (AFRC-421)[Vertex Aerospace LLC] <jesse.f.orellana at nasa.gov>; Paulino, Sylvin S. (AFRC-220)[KAY & ASSOCIATES INC] <sylvin.s.paulino at nasa.gov>; Pompeii, Alexandria M. (ARC-SG)[BAY AREA ENVIRONMENTAL RESEARCH INSTITUTE INC] <alexandria.m.pompeii at nasa.gov>; Radcliff, Rocky J. (AFRC-420) <rocky.j.radcliff at nasa.gov>; Renfro, Roger T. (AFRC-410)[Integration Innovation, Inc.] <roger.t.renfro at nasa.gov>; Reynoso, Andrew J. (AFRC-423)[Vertex Aerospace LLC] <andrew.j.reynoso at nasa.gov>; Ringelberg, Wayne M. (AFRC-410) <wayne.m.ringelberg at nasa.gov>; Sermon, David A. (AFRC-423) <david.a.sermon at nasa.gov>; Smithson, Robert S. (AFRC-424)[Vertex Aerospace LLC] <robert.s.smithson at nasa.gov>; Stu <u2pilot at mac.com>; Stu (Donald) Broce - i3 (tomcatav8r at gmail.com) <tomcatav8r at gmail.com>; Tabla, Jasmine (AFRC-320)[MEDIA FUSION INCORPORATED] <jasmine.tabla at nasa.gov>; Thomas, Brett D. (AFRC-410)[Vertex Aerospace LLC] <brett.d.thomas at nasa.gov>; Thomson, Michael P. (AFRC-320) <michael.p.thomson at nasa.gov>; Vachon, Jacques (AFRC-400) <jacques.vachon-1 at nasa.gov>; Vincent, Ansley K. (AFRC-220)[KAY & ASSOCIATES INC] <ansley.k.vincent at nasa.gov>; Wallace, Alan P. (AFRC-710) <alan.p.wallace at nasa.gov>; Weller, Richard (AFRC-424)[Vertex Aerospace LLC] <richard.weller at nasa.gov>; Wellner, Phillip J. (AFRC-423) <phillip.wellner-1 at nasa.gov>; Williams, Timothy L. (AFRC-410) <timothy.l.williams at nasa.gov>; York, Robert (AFRC-430)[Millennium Engineering and Integration Company] <robert.york-1 at nasa.gov>; Toroni, Gary J. (AFRC-410)[Integration Innovation, Inc.] <gary.j.toroni at nasa.gov>; Stallings, Kirt L. (AFRC-410)[Integration Innovation, Inc.] <kirt.l.stallings at nasa.gov>; Allen, Otis B. (AFRC-421) <otis.b.allen at nasa.gov>; Calvo, Sebastian (GSFC-612.0)[SCIENCE SYSTEMS AND APPLICATIONS INC] <sebastian.calvo at nasa.gov>; Carreno IV, Gustavo (AFRC-421) <gustavo.carreno.iv at nasa.gov>; Martin, Susan M (AFRC-220)[Vertex Aerospace LLC] <susan.m.martin at nasa.gov>
Subject: ER-2 809 Status for Saturday, January 8
All,
We are planning an IMPACTS transit flight for Saturday, January 8th. Checklist version 1.2 attached.
The local (PST) timeline for Saturday's flight:
0500: Crew show / Hands On / Brief - MS Teams (separate invite sent)
0530: Hands off
0800: Take off
~1330 PST (1630 EST): Landing
~1400 PST (1700 EST): Debrief
---------------------------------------------------------
Pilot: Dean Neeley 719-367-7193
Mobile: Kirt Stallings 757-325-7285 // Tim Williams 661-433-0606
INMARSAT/NASDAT: Dave VanGilst 701-330-2978
AMPR: Doug Huie 256-503-1129
CPL: Kenneth Christian 208-596-9065
COSMIR: Matt Fritts 410-718-8023
CRS &
EXRAD &
HIWRAP: Matt McLinden 508-615-9762 / Lihua Li 443-956-1422 / Gerry Heymsfield 240-252-0647
LIP: Monte Bateman 256-694-7804
MVIS/AVS Cameras: Dave VanGilst 701-330-2978
Crew Chief: Darin Whittington 661-425-4481 // Ali Ma 661-425-4528
Avionics: Mike Dorval 661-221-3227
Quality Inspector: Sam Habbal 661-816-5341 // Alvin Mitchell 661-212-0156
Mission Manager: Brian Hobbs 661-221-8235 // Mike Thomson 661-810-8150
Ops Engineer: Tyler Latsha 703-640-4079
v/r
[cid:image003.jpg at 01D80611.3CD5E0D0]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://espo.nasa.gov/pipermail/impacts-er-2/attachments/20220110/cd46a7b8/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 12478 bytes
Desc: image003.jpg
URL: <http://espo.nasa.gov/pipermail/impacts-er-2/attachments/20220110/cd46a7b8/attachment-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IMPACTS YEAR 2 flight checklist v1.3.doc
Type: application/msword
Size: 88064 bytes
Desc: IMPACTS YEAR 2 flight checklist v1.3.doc
URL: <http://espo.nasa.gov/pipermail/impacts-er-2/attachments/20220110/cd46a7b8/attachment-0001.doc>
More information about the Impacts-er-2
mailing list