[Exports_project_office] Tuesday 12 Jun Telecon

Norm Nelson normannelson at ucsb.edu
Mon Jun 11 16:48:23 PDT 2018


Dear EXPORTS survey team, 

Here is a reminder that tomorrow’s telecon slot (9AM PDT / Noon EDT) will be devoted to a discussion of survey ship issues. Use the usual NASA telecon line we’ve been using. 

In a new folder in the Google Drive (EXPORTS : Platform Working Groups : Survey Ship working group : Survey Telecon 11 Jun 2018) please find three documents we’ll discuss during the meeting:

https://drive.google.com/open?id=1jh14RgVKGf-DEBJuTgjaJd2NLcXPcP34

1) Revised lab layout draft
2) Draft Epoch 1 Timeline
3) Draft sampling plan for rosette casts (includes sample count summary!)

We have a number of questions that we’d love your help with this time. 
Some things we’d like to talk about during the meeting:

- Updates on science team members

- Updates on science plan (new NSF project collecting pump samples)

- Lab layout issues (we will walk through this)
	- How should we distribute the underway sw supply (tees?) 

- Draft epoch schedule (we will walk through this)
	- Length of events ok?
	- What to do with “deep” casts?
	- for IOP and pump casts, do we have the stations correctly?
	- Is the Optics cast suite OK (remove 1 deep HPLC, switch off 500m bottle btw Th and VSF, move 95m Th to PIC/BSi bottle)?
	
- Draft sampling plan
	- Have we rendered this correctly (are you getting the samples you want)?
	- What to do with the deep casts?
	- Can we supply this document to Susanne/Ivona to prepare for sample logging/labeling

- Other issues?

Please take some time to study these new documents before the telecon, and we’re looking forward to talking with you at 9. 

Cheers, 
Norm and Mary Jane


Norm Nelson
Earth Research Institute
UC Santa Barbara
norm.nelson at ucsb.edu
Vox: (805) 893-3202



More information about the Exports_project_office mailing list