[Exports_project_office] Fwd: Timing of fueling of Revelle/Ride during EXPORTS MOB
David Siegel
david.siegel at ucsb.edu
Tue Jun 5 15:12:32 PDT 2018
FYI...
> Begin forwarded message:
>
> From: Eric Buck <ebuck at ucsd.edu>
> Subject: Re: Timing of fueling of Revelle/Ride during EXPORTS MOB
> Date: June 5, 2018 at 3:11:51 PM MST
> To: David Siegel <david.siegel at ucsb.edu>, Elizabeth Brenner <ebrenner at ucsd.edu>
> Cc: ebuck at ucsd.edu, Ivona Cetinic <ivona.cetinic at nasa.gov>, Zoltan Kelety <zkelety at ucsd.edu>, Master REVELLE <master at rv-revelle.ucsd.edu>, Master SALLY RIDE <master at rv-sallyride.ucsd.edu>
>
> Hello Dave,
>
> Friday afternoon, August 9th, should be a good time to do your public affairs tours on both vessels.
>
> FYI, a lot of work is going into berthing arrangements for this port call (Aug 3-10) and a number of issues are not yet settled due to high demand at the facility (Pier 90/91). It now seems highly unlikely that REVELLE and RIDE will be berthed next to each other (stem-to-stern); rather, it looks like they will be berthed across from each other on opposite sides of Pier 91. Unfortunately, Pier 90 is not available for us due to US Navy and fishing vessel congestion. See the attached image for the currently planned berthing arrangement at Pier 91.
>
> A decision has not yet been made with regard to fueling both vessels - we are still evaluating options. Fueling by barge and other ship movements at Pier 91 may be restricted by the USCG while cruise ships are at berth - our activities in this regard may be limited to 1800-0400 (when there are no cruise ships at berth). Alternatively, we are looking at fueling REVELLE and RIDE on arrival day (Aug 3 & 4 respectively) at a fuel pier at the opposite end of Elliott Bay; then each vessel would shift to Pier 91 later on arrival day (after 1700-1800 when the cruise ships are gone).
>
> If fueling on arrival day, or by barge during the port call does not work out, then we have to look at fueling on departure day (Aug 10th); that is the least palatable option, but it's on the table for now.
>
> Eric
>
> Eric Buck, Port Captain
> Scripps Institution of Oceanography
> Ship Operations & Marine Technical Support
> 297 Rosecrans Street
> San Diego, CA 92106
> Tel: 858.534.5568
>
> On 6/5/2018 9:33 AM, David Siegel wrote:
>> Hi Eric / Liz,
>>
>> We are getting some pressure from the NASA Public Affairs folks to finalize the times for the NASA media affairs. They want to do this afternoon of August 9 (day before we sail) with 2-3 hours of ship tours sometime in the period 12-5pm of that day. Would that work out for the fueling timing?
>>
>> Thanx in advance, Dave
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://espo.nasa.gov/pipermail/exports_project_office/attachments/20180605/ef139648/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Pier 91 Berthing Prospect, rev2.jpg
Type: image/jpeg
Size: 305431 bytes
Desc: not available
URL: <http://espo.nasa.gov/pipermail/exports_project_office/attachments/20180605/ef139648/attachment-0001.jpg>
More information about the Exports_project_office
mailing list