[All] FW: Planned N232 Power Shutdown To Be Scheduled During A Weekend in Mid-to-Late April 2023

Vasques, Marilyn F. (ARC-SGP) marilyn.vasques at nasa.gov
Mon Apr 3 05:46:58 PDT 2023


All,
Does anyone have concerns about not having power in 232 over any of the weekends listed below?
If you do, please let me know by COB Tuesday 4/4.
Thanks,
M


________________________________
From: Martin, Rodney A. (ARC-TI) <rodney.martin at nasa.gov>
Sent: Friday, March 31, 2023 10:42 AM
To: Scofield, Chris (ARC-SG) <chris.scofield at nasa.gov>; Hunter, Tracy {ARC-CF} (JSC-CF) <tracy.g.hunter at nasa.gov>; Crisolo, Jonathan S. (ARC-CFR) <jonathan.s.crisolo at nasa.gov>; Atkins, Nancy (ARC-PX)[WYLE LABS] <nancy.atkins at nasa.gov>; Rudisel, Carolina. (ARC-D) <carolina.rudisel at nasa.gov>; Reyes, George (ARC-JP) <george.reyes-1 at nasa.gov>; Zulueta, Charles H. (ARC-JP)[American-Paragon Protective Services, LLC] <charles.h.zulueta at nasa.gov>
Cc: Laird, Veronica (ARC-D) <veronica.l.laird at nasa.gov>; Stanton, Edward L. (ARC-P) <edward.l.stanton at nasa.gov>; Martin, Kara (ARC-S) <kara.martin at nasa.gov>; Sun, Sidney C. (ARC-P) <sidney.sun at nasa.gov>; Lee, Katharine K. (ARC-D) <katharine.lee at nasa.gov>; Newfield, Mark E. (ARC-DI) <mark.e.newfield at nasa.gov>; Nguyen, Hung N. (ARC-JCM)[JACOBS] <hung.n.nguyen at nasa.gov>
Subject: Planned N232 Power Shutdown To Be Scheduled During A Weekend in Mid-to-Late April 2023


All:



Please be advised that the weekends of April 15th & 16th, April 22nd  & 23rd or April 29th & 30th have tentatively been proposed as potential dates for the work associated with N232 Install Power Monitoring System (CTO 1770401) project listed below, which will require a power outage for the entire building. The final dates have not yet been finalized, but I wanted to provide as much lead time as possible to make you aware of these plans so that you can begin making preparations for the graceful shutdown of sensitive equipment over the designated weekend when the work will be conducted. This includes the card reader security systems for the building.

I will provide updates as soon as we converge on finalized dates for execution of the work. The reason for the shutdown is associated with plans to upgrade the hardware/equipment associated with a power submetering system that is being supplied by NRSAA partners at Verdigris Technologies. You can read more about the rationale for the upgrade at the Innovation Fair award webpage linked here<https://nasa.sharepoint.com/sites/oscclb/SitePages/Scaling-a-Smart-Sub-metered-Electrical-Data-Solution-for-the-Center.aspx>. Please let me know of any concerns, questions, issues, etc., that you may have ASAP.



Best Regards,

Rodney Martin



Rodney A. Martin, Ph.D.

Intelligent Systems Division

Deputy Discovery and Systems Health Technical Area<https://ti.arc.nasa.gov/tech/dash/> Lead

Agencywide "Smart Center" Initiative Lead

Sustainability Base Research Lead

N232 Facility Support Manager

NASA Ames Research Center

Bldg. N269, Rm. 192-2

Bldg. N232, Rm. 223

P.O. Box 1

Mail Stop 269-3/4

Moffett Field, CA 94035

N269/192-2 Office Ph:, KEY 1:  +1 (650) 604-1334 (voice mail-enabled)

N232/223 Office Ph:, KEY 1 +1 (650) 604-1335 (no voice mail), KEY 2: +1 (650) 604-1334 (rings here as well)

rodney.martin at nasa.gov<mailto:rodney.martin at nasa.gov>

http://ti.arc.nasa.gov/profile/rmartin<http://ti.arc.nasa.gov/profile/rmartin/>

[cid:image001.jpg at 01D965EF.B3958510][Logo  Description automatically generated]      [Logo, icon  Description automatically generated]

[cid:image004.gif at 01D965EF.B3958510]









From: Hogan, Roxana L. (ARC-JCM) <roxana.hogan at nasa.gov>
Sent: Friday, March 31, 2023 10:03 AM
To: Martin, Rodney A. (ARC-TI) <rodney.martin at nasa.gov>; Scofield, Chris (ARC-SG) <chris.scofield at nasa.gov>; Hunter, Tracy {ARC-CF} (JSC-CF) <tracy.g.hunter at nasa.gov>; Stanton, Edward L. (ARC-P) <edward.l.stanton at nasa.gov>; Crisolo, Jonathan S. (ARC-CFR) <jonathan.s.crisolo at nasa.gov>; Atkins, Nancy (ARC-PX)[WYLE LABS] <nancy.atkins at nasa.gov>; Laird, Veronica (ARC-D) <veronica.l.laird at nasa.gov>; Rudisel, Carolina. (ARC-D) <carolina.rudisel at nasa.gov>
Cc: Belanger, Lorin D. (ARC-JCM) <lorin.d.belanger at nasa.gov>; Pham, Khoi M. (ARC-JCM) <khoi.m.pham at nasa.gov>; Chahal, Waheguru S. (ARC-JCM) <waheguru.s.chahal at nasa.gov>; Miller, Roger A. (ARC-JCM) <roger.a.miller at nasa.gov>; Sethna, Shaina V. (ARC-JCM) <shaina.v.sethna at nasa.gov>; Fearon, Stewart (ARC-JC) <stewart.r.fearon at nasa.gov>; Mieczkowski, Thomas S. (ARC-JC) <thomas.s.mieczkowski at nasa.gov>; Stednitz, Kent A. (ARC-JCM) <kent.a.stednitz at nasa.gov>; Morehead, Jeffrey M. (ARC-JCM) <jeffrey.m.morehead at nasa.gov>; Nguyen, Hung N. (ARC-JCM)[JACOBS] <hung.n.nguyen at nasa.gov>; Preston, William T. (ARC-JCM)[JACOBS] <william.t.preston at nasa.gov>; Farhat, Mark (ARC-JCM)[JACOBS] <mark.farhat at nasa.gov>; Vigallon, Darrin A. (ARC-JCM)[JACOBS] <darrin.a.vigallon at nasa.gov>
Subject: 3-31-23 N232 Project Updates



Hello All,

Below are the project updates for N232 as of 3/31/23.

Thank you,

Roxana



Acronyms:

CTO –  Contract Task Order for facilities related work.  CTO’s require approval signatures from the Contracting Officer Representative (COR) and the Contracting Officer (CO) prior to PO issuance, materials ordered and work scheduled.

RTO – Request for Task Order generated by AFSS (Jacobs) to identify potential facilities related work, which the government may issue as an official CTO.



N232 Repair Heat Pump 4 Piping (CTO 1680517) – Jacobs awaiting quote.



N232 Install Power Monitoring System (CTO 1770401) – CTO approved and PR/PO processed.



N232 & N288, Assess & Replace – Building Automation System (BAS) Maintenance Control System (CTO 0670051) – Quotes received and in review.



T/C 16711794 N232 Elevator Phone – The Power supply to the elevator is not working, not able to continue testing the phone. Jacobs working with Vintage Elevator & James Sheppard to resolve.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://espo.nasa.gov/pipermail/all/attachments/20230403/82b10b92/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 3995 bytes
Desc: image001.jpg
URL: <http://espo.nasa.gov/pipermail/all/attachments/20230403/82b10b92/attachment-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 124868 bytes
Desc: image002.png
URL: <http://espo.nasa.gov/pipermail/all/attachments/20230403/82b10b92/attachment-0002.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.png
Type: image/png
Size: 84989 bytes
Desc: image003.png
URL: <http://espo.nasa.gov/pipermail/all/attachments/20230403/82b10b92/attachment-0003.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.gif
Type: image/gif
Size: 5784 bytes
Desc: image004.gif
URL: <http://espo.nasa.gov/pipermail/all/attachments/20230403/82b10b92/attachment-0001.gif>


More information about the All mailing list