DC-8 11/01/12 - 11/02/12

Download PDF
Flight Number: 
130116
Payload Configuration: 
OIB Antarctic 2012
Nav Data Collected: 
Yes
Total Flight Time: 
12 hours
Flight Segments: 
From:SCCITo:SCCI
Start:11/01/12 12:07 Z Finish:11/02/12 00:08 Z
Flight Time:12 hours
Log Number:138003PI:Michael Studinger
Funding Source:Bruce Tagg - NASA - SMD - ESD Airborne Science Program
Purpose of Flight:Science
Comments:Depart SCCI at 1207Z. Perform calibration ramp pass to the SE and overfly targets at 1216Z at 1200 ft AGL. Climb to cruise altitudes of FL310 to FL350. Perform gravity data line starting at 1533Z and ending 1625Z at FL350. Descend to 1500ft AGL to cross first low altitude science waypoint at 1659Z. Continue to fly ground track pattern around glacier grounding line of Ronne and Support Force glaciers. Pass over final low altitude waypoint at 1956Z. Perform radar pitch maneuvers at 2000 ft AGL at 1810Z. High altitude ATM data collected during transit segments. Climb to FL400 for transit to Punta Arenas. Mission information Tweeted through NASA Headquarters during flight. Two Chilean teachers, a Chilean Journalist, Dinah Arnett from the US embassy in Chile joined our flight. Land SCCI at 0008Z.
Flight Hour Summary: 
138003
Flight Hours Approved in SOFRS200
Total Used215.7
Total Remaining-15.7
138003 Flight Reports
Date Flt # Purpose of Flight Duration Running Total Hours Remaining Miles Flown
10/02/12130101Check55195
10/03/12130102Check3.28.2191.8
10/08/12 - 10/09/12130103Transit10.718.9181.1
10/10/12130104Transit3.222.1177.9
10/12/12130105Science11.233.3166.7
10/13/12 - 10/14/12130106Science10.944.2155.8
10/15/12130107Science11.655.8144.2
10/16/12 - 10/17/12130108Science11.867.6132.4
10/18/12130109Science11.679.2120.8
10/19/12 - 10/20/12130110Science10.289.4110.6
10/22/12130111Science11.2100.699.4
10/23/12 - 10/24/12130112Science11.3111.988.1
10/25/12130113Science11.4123.376.7
10/27/12130114Science11.4134.765.3
10/28/12 - 10/29/12130115Science11.314654
11/01/12 - 11/02/12130116Science1215842
11/02/12 - 11/03/12130117Science10.6168.631.4
11/04/12130118Science11179.620.4
11/06/12 - 11/07/12130119Science9.418911
11/07/12 - 11/08/12130120Science11.5200.5-0.5
11/09/12130121Transit3.3203.8-3.8
11/10/12 - 11/11/12130122Transit11.6215.4-15.4
11/11/12130123Transit0.3215.7-15.7

Flight Reports began being entered into this system as of 2012 flights. If there were flights flown under an earlier log number the flight reports are not available online.

Related Science Report: 

OIB - DC-8 11/01/12 Science Report

Mission: 
OIB
Mission Summary: 

F12 Ronne Ice Shelf - Grounding Line East

Accomplishments

  • Low-altitude survey (1,500 ft AGL) over the grounding line area of the Foundation Ice Stream and Support Force Glacier.
  • Completed all planned survey lines, except for the last 50 nautical miles in order to have enough reserve fuel.
  • Collected additional high altitude ATM and DMS data over sea ice in the Bellingshausen and Weddell Sea during transits as well as over the Antarctic Peninsula.
  • Collected high-altitude gravity data over the Ronne Ice Shelf.
  • Conducted pitch maneuvers for time stamp verification of snow and Ku-band radars.
  • Conducted ramp pass (1,500 ft AGL) at Punta Arenas airport after takeoff for DMS, ATM, snow and Ku-band radar instrument calibration.
  • ATM, MCoRDS, snow and Ku-band radars, gravimeter, and DMS were operated on the survey lines.
  • Hosted a question and answer session on NASA_ICE Twitter on today's flight with 40 live "tweets".
  • Satellite Tracks: none
  • Repeat Mission: none

Science Data Report Summary

Instrument Operated Data Volume Instrument Issues/Comments
ATM yes 42 GB None
DMS yes 50 GB None
Snow Radar yes 350 GB None. Altitude too low during ramp pass, but can be fixed.
Ku-band Radar yes 350 GB None. Altitude too low during ramp pass, but can be fixed.
MCoRDS yes 800 GB None
KT-19 yes 20 MB None
Gravimeter yes 1.2 GB None
DC-8 On-board Data yes 40 MB None

Mission Report (Michael Studinger, Mission Scientist)

The weather conditions in the Weddell Sea forced us again to fly a land ice mission, but at least we were able to choose a high priority mission with regional high priority. Today's mission Ronne Grounding Line East marks the accomplishment of a major IceBridge milestone. Over the last 4 years we have flown a total of 8 dedicated missions to map the entire grounding line from the Getz Ice Shelf over the Antarctic Peninsula and into the Ronne Ice Shelf. We have surveyed 4374 nautical miles, or 8100 km of grounding line, which is a remarkable accomplishment.

We spend considerable time in the weather office this morning to understand the weather situation, in particular a system causing clouds in the survey area. After comparing different models and satellite imagery we convinced ourselves that the clouds would be high enough for us to work below the cloud layer. The weather in the area was perfect. We had to skip the last 50 nautical miles of the planned low altitude survey in order to have enough reserve fuel for the way home.

At the end of the line on the Ronne Ice Shelf we flow over an old seismic survey site that will help to tie the bathymetry estimates from gravity data to the depth estimates from seismic measurements. We also collected high-altitude gravity data en-route to the area. We collected an additional 2.7 hours of high-altitude data with ATM and DMS over sea ice in the Bellingshausen and Weddell Sea on the transits with beautiful and rare views of the Antarctica Peninsula.

We flew a ramp pass at Punta Arenas airport at 1,500 ft AGL after takeoff to ensure data collection during daylight for DMS and ATM instrument calibration.

We hosted a question and answer session on NASA_ICE Twitter during today's flight with help from NASA Headquarters PAO. We had two school teachers and a reporter from Punta Arenas with us and two people from the US Embassy in Santiago as part of our education and outreach activities.

ATM data collection Time (UTC) Hours
Begin low altitude data collection 16:49
End low altitude data collection 19:52 3.2
Various high altitude segments 2.7
Total 5.9
Images: 

Trajectory map of today’s science mission

The DC-8 on the ramp in Punta Arenas getting ready for science flight #12

An IL-76 parked on taxiway "Echo" in Punta Arenas

View of the Ellsworth Mountains during today's mission