Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

Photo primarily shows an instrument or other sensor.

Synonyms: 
Sensor

Instrument work on a no-fly day

John Miller at the rack of Programmable Flask Packages (PFP) installed in the DC-8

Drew Rollins installing the inlet plumbing on the NOyO3

Checking the center of gravity on the SP2. Pictured from left to right: Shuka Schwarz, Amy Sullivan and Mike Bereda

Picture of the day: AMP team from NOAA getting ready to install their rack in the DC-8. Adam Ahern, Sam Taylor, Isaac and Chuck Brock

Attached Photo: NOAA CIMS rack assembly (Steve B., Eleanor W. Chris J.,Xiaoli S., Justin J.)

Pages

Subscribe to RSS - Instrument