Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

Associated content: 

DCOTSS 07/13/22 Mission Daily Schedule

Finish de-integration, packing and shipping.

DCOTSS 07/12/22 Mission Daily Schedule

De-integration
1000 – Hands-on
1900 – Hands-off
 
Looking ahead:
July 13
Finish de-integration, packing, and shipping

It's a Wrap for DCOTSS 2022

Particle Analysis by Laser Mass Spectrometry - NG (PALMS-NG)

DCOTSS 07/11/22 Mission Daily Schedule

Flight Day RF #12 (RF #23 total)
0700 -- VCC opens for people that need renewed badges
0800 -- Hands-On
0900 -- Pre-flight Brief
1000 -- Hands Off
1200 -- Take Off Time
2000 -- Landing
2200 -- Hands off
 
July 12 -- De-Integration
1000 -- Hands-On
1900 -- Hands-Off 
 
July 13 
Finish de-integration, packing, and shipping

Sunrise Flight on July 8th

DCOTSS 07/10/22 Mission Daily Schedule

All times PDT
 
Instrument access day
0800 – Start ER-2 crew support, ESPO FNE support, full workday.
 
Looking ahead:
July 11 – Flight Day, RF 12 (RF 23 total).
0900 – tentative take off time.
This will be the last research flight of this campaign.

 

DCOTSS 07/09/22 Mission Daily Schedule

No ER-2 crew support
~0900-1100 Lab Access w/ FNE available
 
Jul 10 -- Instrument access day
0800 - Start ER-2 crew support, full work day
 
Jul 11 -- Flight Day, RF12 (RF 23 total) 
0900 -- Tentative Take Off time
This will be the last research flight of this campaign
 
Updates 
Successful RF11 (RF22 total) 'Sunrise flight' 
 

DCOTSS 07/07/22 Mission Daily Schedule

All times PDT

This schedule spans two days, July 7th and 8th
July 7th
0900 – FFP
1100 – All-hands
1900 – FNE available at the hangar
2200 – FFP (pre-flight)
2230 – Hands ON
2330 – Pre-flight brief
July 8th
0230 – Take Off for 8h
1030 – Landing time
1230 – Hands off
Updates:
Successful 7.9 hour southern survey flight on 7/6.

Meteorological Measurement System (MMS)

Pages

Subscribe to RSS - DCOTSS