Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test

Short Title
Block 1 Acceptance Test
Aircraft
Activity Category
Maintenance
Location
General Atomics ASI, Poway, CA
Details

The Ikhana will be receiving a major upgrade to the production avionics and flight controls from the current pre-production to a "Block 1" production configuration. This will significantly enhance the long term sustainability of the system as well as upgrade it's capabilities. For example the aircraft electrical power available to payloads will increase from ~2Kw to over 8Kw.

Date
-

 

Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.