Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

December 2015

Sun Mon Tue Wed Thu Fri Sat
29
30
1
2
3
4
5
« P-3 Re-Wing, Empenage Work and PDM 2014-08-18 - 2016-06-05
»
« Scheduled Maintenance 2015-07-01 - 2016-01-28
»
« 600-Hour Maintenance 2015-09-14 - 2016-02-11
»
« Phase Inspection and Avionics Upgrade 2015-09-30 - 2015-12-31
»
« Aircraft Repair 2015-10-01 - 2016-01-08
»
« Block 10 Standup 2015-10-01 - 2017-05-12
»
« NAMIS Review 2015-11-06 - 2015-11-30
 
Inmarsat Configuration Flights 2015-12-01 - 2015-12-03
 
 
 
« 992 Maintenance 2015-11-07 - 2015-11-29
 
Local Currency Flights 2015-11-30 - 2015-12-03
 
 
 
« Minor Ops Inspection 2015-11-20 - 2016-03-15
»
« SIERRA-2 Flight testing 2015-11-02 - 2015-11-30
 
 
 
CARVE Download 2015-12-03 - 2015-12-07
»
« HSRL-2 Ozone 2015-11-19 - 2016-01-21
»
« Remote Sensing 2015-10-01 - 2016-01-29
»
« GPM OLYMPEX, FR168201 2015-11-10 - 2015-12-22
»
« RADEX-15 Deployment 2015-11-16 - 2015-12-15
»
« C-130 Modifications/ Annual Maintenance 2015-06-27 - 2016-04-19
»
 
NAAMES - Download 2015-11-30 - 2015-12-04
 
 
 
 
 
 
 
6
7
8
9
 
Direct Return Mission 2015-12-07 - 2015-12-11
 
 
 
UAS-NAS FT4 Configuration Mod 2015-12-07 - 2016-02-27
»
« CARVE Download 2015-12-03 - 2015-12-07
 
Post Mission Maintenance 2015-12-08 - 2015-12-11
 
 
 
 
Annual Maintenance 2015-12-08 - 2016-03-16
»
« P-3 Re-Wing, Empenage Work and PDM 2014-08-18 - 2016-06-05
»
« Scheduled Maintenance 2015-07-01 - 2016-01-28
»
« 600-Hour Maintenance 2015-09-14 - 2016-02-11
»
« Phase Inspection and Avionics Upgrade 2015-09-30 - 2015-12-31
»
« Aircraft Repair 2015-10-01 - 2016-01-08
»
« Block 10 Standup 2015-10-01 - 2017-05-12
»
« Minor Ops Inspection 2015-11-20 - 2016-03-15
»
« HSRL-2 Ozone 2015-11-19 - 2016-01-21
»
« Remote Sensing 2015-10-01 - 2016-01-29
»
« GPM OLYMPEX, FR168201 2015-11-10 - 2015-12-22
»
« RADEX-15 Deployment 2015-11-16 - 2015-12-15
»
« C-130 Modifications/ Annual Maintenance 2015-06-27 - 2016-04-19
»
 
 
 
 
 
 
« P-3 Re-Wing, Empenage Work and PDM 2014-08-18 - 2016-06-05
»
« Scheduled Maintenance 2015-07-01 - 2016-01-28
»
« 600-Hour Maintenance 2015-09-14 - 2016-02-11
»
« Phase Inspection and Avionics Upgrade 2015-09-30 - 2015-12-31
»
« Aircraft Repair 2015-10-01 - 2016-01-08
»
« Block 10 Standup 2015-10-01 - 2017-05-12
»
« Minor Ops Inspection 2015-11-20 - 2016-03-15
»
« Annual Maintenance 2015-12-08 - 2016-03-16
»
« HSRL-2 Ozone 2015-11-19 - 2016-01-21
»
« Remote Sensing 2015-10-01 - 2016-01-29
»
« GPM OLYMPEX, FR168201 2015-11-10 - 2015-12-22
»
« RADEX-15 Deployment 2015-11-16 - 2015-12-15
 
 
RADEX-15 Download 2015-12-17 - 2015-12-18
 
 
« C-130 Modifications/ Annual Maintenance 2015-06-27 - 2016-04-19
»
« UAS-NAS FT4 Configuration Mod 2015-12-07 - 2016-02-27
»
 
992 Maintenance 2015-12-14 - 2016-01-03
»
Annual Maintenance 2015-12-15 - 2016-03-30
»
 
 
 
« P-3 Re-Wing, Empenage Work and PDM 2014-08-18 - 2016-06-05
»
« Scheduled Maintenance 2015-07-01 - 2016-01-28
»
« 600-Hour Maintenance 2015-09-14 - 2016-02-11
»
« Phase Inspection and Avionics Upgrade 2015-09-30 - 2015-12-31
»
« Aircraft Repair 2015-10-01 - 2016-01-08
»
« Block 10 Standup 2015-10-01 - 2017-05-12
»
« Minor Ops Inspection 2015-11-20 - 2016-03-15
»
« Annual Maintenance 2015-12-08 - 2016-03-16
»
« 992 Maintenance 2015-12-14 - 2016-01-03
»
« Annual Maintenance 2015-12-15 - 2016-03-30
»
« HSRL-2 Ozone 2015-11-19 - 2016-01-21
»
« Remote Sensing 2015-10-01 - 2016-01-29
»
« GPM OLYMPEX, FR168201 2015-11-10 - 2015-12-22
 
GPM OLYMPEX Download 2015-12-23 - 2015-12-24
 
 
 
« C-130 Modifications/ Annual Maintenance 2015-06-27 - 2016-04-19
»
« UAS-NAS FT4 Configuration Mod 2015-12-07 - 2016-02-27
»
 
 
 
 
 
 
 
1
2
« P-3 Re-Wing, Empenage Work and PDM 2014-08-18 - 2016-06-05
»
« Scheduled Maintenance 2015-07-01 - 2016-01-28
»
« 600-Hour Maintenance 2015-09-14 - 2016-02-11
»
« Phase Inspection and Avionics Upgrade 2015-09-30 - 2015-12-31
 
 
 
« Aircraft Repair 2015-10-01 - 2016-01-08
»
« Block 10 Standup 2015-10-01 - 2017-05-12
»
« Minor Ops Inspection 2015-11-20 - 2016-03-15
»
« Annual Maintenance 2015-12-08 - 2016-03-16
»
« 992 Maintenance 2015-12-14 - 2016-01-03
»
« Annual Maintenance 2015-12-15 - 2016-03-30
»
« HSRL-2 Ozone 2015-11-19 - 2016-01-21
»
« Remote Sensing 2015-10-01 - 2016-01-29
»
« C-130 Modifications/ Annual Maintenance 2015-06-27 - 2016-04-19
»
« UAS-NAS FT4 Configuration Mod 2015-12-07 - 2016-02-27
»
 
Fuel Tank Maintenance 2015-12-28 - 2016-01-14
»
GPM OLYMPEX Download 2015-12-28 - 2015-12-31