Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

March 2014

Sun Mon Tue Wed Thu Fri Sat
23
24
25
26
27
28
1
« Minor Ops Inspection 2013-11-20 - 2014-02-28
 
UAS Modifications/Ground Tests 2014-03-01 - 2014-04-30
»
 
 
Deconfigure from AirMOSS 2014-02-27 - 2014-03-03
»
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« DC-8 at Heavy C Check Facility 2013-11-12 - 2014-03-01
 
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« 600-Hr Inspection/Maintenance 2014-01-06 - 2014-04-08
»
« Remote Sensing Avionics Upgrade 2014-02-03 - 2014-03-31
»
« Phase 3 and 4 Inspection 2014-02-03 - 2014-02-28
 
 
« Scheduled Maintenance 2014-02-14 - 2014-03-28
»
« UAS in the NAS Hardware Integration 2014-02-17 - 2014-02-28
 
 
« ACES 2014-02-03 - 2014-03-14
»
« AirSWOT Cal/Check Flights 2014-02-13 - 2014-05-16
»
« ATTREX Deployment Guam 2014-01-21 - 2014-03-14
»
« NGC Work 2013-12-06 - 2014-06-30
»
 
Operation Ice Bridge - Upload 2014-02-24 - 2014-02-26
 
 
 
 
2
3
4
5
6
7
8
« Deconfigure from AirMOSS 2014-02-27 - 2014-03-03
 
 
 
 
Direct Return Mission 2014-03-07 - 2014-03-11
»
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« 600-Hr Inspection/Maintenance 2014-01-06 - 2014-04-08
»
« Remote Sensing Avionics Upgrade 2014-02-03 - 2014-03-31
»
« Scheduled Maintenance 2014-02-14 - 2014-03-28
»
« ACES 2014-02-03 - 2014-03-14
»
« AirSWOT Cal/Check Flights 2014-02-13 - 2014-05-16
»
« ATTREX Deployment Guam 2014-01-21 - 2014-03-14
»
« NGC Work 2013-12-06 - 2014-06-30
»
« UAS Modifications/Ground Tests 2014-03-01 - 2014-04-30
»
 
UAS in the NAS Hardware Integration 2014-03-03 - 2014-03-07
 
 
WFF Closed Due to Snow 2014-03-03 - 2014-03-04
 
 
 
 
 
Local Flights 2014-03-03 - 2014-03-05
 
 
 
 
CALIPSO Cal/Val 2014-03-03 - 2014-04-15
»
 
 
 
9
« Direct Return Mission 2014-03-07 - 2014-03-11
 
 
 
 
GH 872 Team Returns to DFRC 2014-03-15 - 2014-03-17
»
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« 600-Hr Inspection/Maintenance 2014-01-06 - 2014-04-08
»
« Remote Sensing Avionics Upgrade 2014-02-03 - 2014-03-31
»
« Scheduled Maintenance 2014-02-14 - 2014-03-28
»
« ACES 2014-02-03 - 2014-03-14
 
 
« AirSWOT Cal/Check Flights 2014-02-13 - 2014-05-16
»
« ATTREX Deployment Guam 2014-01-21 - 2014-03-14
 
 
« CALIPSO Cal/Val 2014-03-03 - 2014-04-15
»
« NGC Work 2013-12-06 - 2014-06-30
»
« UAS Modifications/Ground Tests 2014-03-01 - 2014-04-30
»
 
Maintenance 2014-03-10 - 2014-04-16
»
Operation Ice Bridge 2014-03-10 - 2014-05-23
»
 
 
Reconfigure for AirMOSS 2014-03-12 - 2014-03-16
»
 
 
 
 
« GH 872 Team Returns to DFRC 2014-03-15 - 2014-03-17
 
AirMOSS Mission Calibration (FR 14G015) 2014-03-18 - 2014-03-23
»
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« 600-Hr Inspection/Maintenance 2014-01-06 - 2014-04-08
»
« Remote Sensing Avionics Upgrade 2014-02-03 - 2014-03-31
»
« Scheduled Maintenance 2014-02-14 - 2014-03-28
»
« Maintenance 2014-03-10 - 2014-04-16
»
« AirSWOT Cal/Check Flights 2014-02-13 - 2014-05-16
»
« CALIPSO Cal/Val 2014-03-03 - 2014-04-15
»
« Operation Ice Bridge 2014-03-10 - 2014-05-23
»
« NGC Work 2013-12-06 - 2014-06-30
»
« UAS Modifications/Ground Tests 2014-03-01 - 2014-04-30
»
« Reconfigure for AirMOSS 2014-03-12 - 2014-03-16
 
B Check 2014-03-17 - 2014-04-11
»
 
 
ATTREX Download 2014-03-18 - 2014-04-18
»
 
UAS in the NAS Flight Testing 2014-03-20 - 2014-04-18
»
 
Airshow Flyover 2014-03-21 - 2014-03-22
 
 
 
« Acceptance Inspection 2013-09-11 - 2014-04-03
»
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« 600-Hr Inspection/Maintenance 2014-01-06 - 2014-04-08
»
« Remote Sensing Avionics Upgrade 2014-02-03 - 2014-03-31
»
« Scheduled Maintenance 2014-02-14 - 2014-03-28
 
 
« Maintenance 2014-03-10 - 2014-04-16
»
« B Check 2014-03-17 - 2014-04-11
»
Ship 2 Modifications 2014-03-23 - 2014-07-31
»
« AirSWOT Cal/Check Flights 2014-02-13 - 2014-05-16
»
« UAS in the NAS Flight Testing 2014-03-20 - 2014-04-18
»
« CALIPSO Cal/Val 2014-03-03 - 2014-04-15
»
« Operation Ice Bridge 2014-03-10 - 2014-05-23
»
« AirMOSS Mission Calibration (FR 14G015) 2014-03-18 - 2014-03-23
 
AirMOSS Mission CR (FR 14G016) 2014-03-24 - 2014-04-02
»
« NGC Work 2013-12-06 - 2014-06-30
»
« UAS Modifications/Ground Tests 2014-03-01 - 2014-04-30
»
« ATTREX Download 2014-03-18 - 2014-04-18
»
 
Two-Micron IPDA Lidar Flight Test 2014-03-24 - 2014-04-18
»
NAIMS 2014-03-24 - 2014-03-28
 
 
 
H-2 Payload I&T 2014-03-26 - 2014-04-13
»
 
 
 
 
1
2
3
4
5
« AirMOSS Mission CR (FR 14G016) 2014-03-24 - 2014-04-02
 
992 Maintenance 2014-04-03 - 2014-04-11
»
« Acceptance Inspection 2013-09-11 - 2014-04-03
 
 
 
« Major Ops Inspection 2013-12-16 - 2014-08-18
»
« 600-Hr Inspection/Maintenance 2014-01-06 - 2014-04-08
»
« Remote Sensing Avionics Upgrade 2014-02-03 - 2014-03-31
 
Flight Testing 2014-04-01 - 2014-05-15
»
« Maintenance 2014-03-10 - 2014-04-16
»
« B Check 2014-03-17 - 2014-04-11
»
« Ship 2 Modifications 2014-03-23 - 2014-07-31
»
« AirSWOT Cal/Check Flights 2014-02-13 - 2014-05-16
»
« UAS in the NAS Flight Testing 2014-03-20 - 2014-04-18
»
« Two-Micron IPDA Lidar Flight Test 2014-03-24 - 2014-04-18
»
« CALIPSO Cal/Val 2014-03-03 - 2014-04-15
»
« Operation Ice Bridge 2014-03-10 - 2014-05-23
»
« H-2 Payload I&T 2014-03-26 - 2014-04-13
»
« NGC Work 2013-12-06 - 2014-06-30
»
« UAS Modifications/Ground Tests 2014-03-01 - 2014-04-30
»
« ATTREX Download 2014-03-18 - 2014-04-18
»
 
HyspIRI 2014-03-31 - 2014-05-09
»